My WebLink
|
Help
|
About
|
Sign Out
Home
03/03/16
Ramsey
>
Economic Development Authority
>
Full Agendas
>
2010's
>
2016
>
03/03/16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2016 11:42:31 AM
Creation date
3/10/2016 11:36:05 AM
Metadata
Fields
Template:
Full Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
122
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Considerations <br />• Developable land will not be "shovel ready" from an arterial <br />infrastructure perspective in phases. This is not attractive to <br />developers. <br />• Arterial infrastructure discussions would likely <br />complicate/get wrapped into each individual development. <br />This may result in inconsistencies (i.e. may become a <br />negotiable item for each individual deal; and the quality/ <br />consistency of arterial infrastructure construction could <br />change for each individual project). <br />• This is not an efficient manner in which to construct major <br />infrastructure (this will drive overall costs upward). <br />Benefits <br />• This option allows for maximum market <br />driven flexibility. This option requires no <br />risk from an upfront investor. <br />• This alternative would require no major <br />upfront investments. <br />• This strategy is very straight forward and <br />easy to understand. <br />/ <br />EE <br />p <br />E <br />D <br />$ <br />E <br />/ <br />S <br />e <br />\�\{§/\7 <br />�)0- <br />ro <br />U=\\\C_ <br />1 <br />1 <br />0 ® <br />\\\fD <br />%°. 0\ \ <br />7 0 o e 2/ <br />{ \ G ± 7 & <br />$®ƒ2 \ <br />/\\/sm �\ <br />[Intentionally left blank] <br />m <br />0 <br />{ <br />
The URL can be used to link to this page
Your browser does not support the video tag.