My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/23/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 02/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:47:31 PM
Creation date
3/11/2016 8:29:57 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/23/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Orr Uission: To work together to resposihty grow our community, and to provide quality, cost-effective, and efficient government ierwlcea. <br />CC Regular Session 7. 4. <br />Meeting Date: 02/23/2016 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Information <br />Title: <br />Adopt Resolution #16-02-040 Accepting Feasibility Report and Ordering Plans and Specifications for Improvement <br />Project #16-36, Business Park 95 Regional Stormwater Pond Improvements <br />Purpose/Background: <br />Purpose: <br />The purpose of this case is to consider adopting Resolution #16-02-040 accepting the Feasibility Report and <br />ordering Plans and Specifications for Improvement Project #16-36, Business Park 95 Regional Stormwater Pond <br />Improvements. <br />Background: <br />The City of Ramsey developed Business Park 95. As part of the original development an existing low area was set <br />aside for minimal stormwater ponding with no outlet controls. Available City records indicate that this ponding <br />area was intended to be increased in capacity and that an outlet was to be constructed in the future when warranted <br />by development. To date, the ponding capacity has not been increased and no outlet has been constructed even <br />though the business park is now almost fully developed. <br />The recent business expansion of Dedicated Networks disturbed more than one (1) acre, necessitating a Lower <br />Rum River Watershed Management Organization (LRRWMO) Permit. The site was not large enough to <br />accommodate the building expansion and increased stormwater ponding. The developer therefore approached the <br />City about enlarging the existing ponding area to accept the runoff from the new building expansion. The <br />stormwater management plan for Dedicated Networks provided for infiltration of runoff from the new impervious <br />surfaces, with ponding provided in the adjacent regional pond. The permit was approved by the LRRWMO Board <br />with the condition that an outlet be provided for the pond in 2016. <br />The proposed pond capacity and outlet improvements will be designated as Improvement Project #16-36; Business <br />Park 95 Regional Stormwater Pond Improvements. <br />Notification: <br />No notifications are required for this case. <br />Observations/Alternatives: <br />
The URL can be used to link to this page
Your browser does not support the video tag.