Laserfiche WebLink
5. FINANCING <br />5.1 Opinion of Cost <br />A detailed opinion of probable costs for the proposed improvements can be found in Appendix B <br />of this report. The opinion of probable costs incorporates anticipated 2016 construction costs for <br />the proposed improvements, as well as 10% construction contingencies plus 23% indirect costs <br />for administrative, engineering, financing and legal costs. <br />City staff prepared the Feasibility Report in-house as part of staff's normal duties. <br />A Geotechnical Evaluation Report was not completed as part of this project. <br />5.2 Funding <br />5.2.1 Stormwater Management / Utility Funds <br />Staff proposes to finance the proposed pond improvements entirely using Stormwater <br />Management and Stormwater Utility Funds based on a cost -split of one-third Stormwater <br />Management Funds (Fund 9292), and two-thirds Storm Water Utility Funds (Fund 9605). <br />Based on estimated project costs this results in a cost -split of $110,833.33 Stormwater <br />Management Funds (Fund 9292), and $221,666.67 Storm Water Utility Funds (Fund <br />9605). The proposed cost -split will ultimately be applied to actual project costs. <br />5.2.2 Special Assessments <br />The City's adopted Special Assessments Policy allows for the use of special assessments <br />to pay for a portion of storm sewer improvement projects. However, available project <br />records indicate that the City fully intended to construct the outlet improvements when <br />warranted be development without assessing benefiting properties within the business <br />park. Staff therefore does not propose to use special assessments to pay for any of the <br />proposed improvements. <br />Feasibility Report <br />Business Park 95 Regional Stonnwater Pond Improvements <br />City of Ramsey Project No. 16-36 <br />Page 6 <br />