My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 02/23/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 02/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:47:31 PM
Creation date
3/11/2016 8:29:57 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
02/23/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
368
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5. FINANCING <br />5.1 Opinion of Cost <br />A detailed opinion of probable costs for the proposed improvements can be found in Appendix B <br />of this report. The opinion of probable costs incorporates anticipated 2016 construction costs for <br />the proposed improvements, as well as 10% construction contingencies plus 23% indirect costs <br />for administrative, engineering, financing and legal costs. <br />City staff prepared the Feasibility Report in-house as part of staff's normal duties. <br />A Geotechnical Evaluation Report was not completed as part of this project. <br />5.2 Funding <br />5.2.1 Stormwater Management / Utility Funds <br />Staff proposes to finance the proposed pond improvements entirely using Stormwater <br />Management and Stormwater Utility Funds based on a cost -split of one-third Stormwater <br />Management Funds (Fund 9292), and two-thirds Storm Water Utility Funds (Fund 9605). <br />Based on estimated project costs this results in a cost -split of $110,833.33 Stormwater <br />Management Funds (Fund 9292), and $221,666.67 Storm Water Utility Funds (Fund <br />9605). The proposed cost -split will ultimately be applied to actual project costs. <br />5.2.2 Special Assessments <br />The City's adopted Special Assessments Policy allows for the use of special assessments <br />to pay for a portion of storm sewer improvement projects. However, available project <br />records indicate that the City fully intended to construct the outlet improvements when <br />warranted be development without assessing benefiting properties within the business <br />park. Staff therefore does not propose to use special assessments to pay for any of the <br />proposed improvements. <br />Feasibility Report <br />Business Park 95 Regional Stonnwater Pond Improvements <br />City of Ramsey Project No. 16-36 <br />Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.