Laserfiche WebLink
I <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br />I <br />I <br />! <br /> <br />i <br />I <br />I <br />I <br />I <br />I <br /> <br /> ASSESSMENT COSTS <br /> <br />Project: #82-4 Bower's Mississippi Acres 3rd Addition <br /> <br />Construction <br /> <br />Engineering, Staking, Inspection <br /> <br />Fiscal and Legal <br /> <br />Administrative and Escrow <br /> <br />Miscellaneous (Testing, Assessments & <br /> Contingencies) <br /> <br />$14,500.00 <br />2,675.25 <br />196.87 <br />725.00 <br />800.00 <br /> <br />Total Cost <br /> <br />Number of Units <br /> <br />Cost per Unit <br /> <br />$18,897.12 <br /> <br /> 12 <br /> <br />$ 1,574.80 <br /> <br /> <br />