Laserfiche WebLink
BID SCHEDULE 5.000 PAGE 2 <br />~MPROVEMENT PROJECT - 82-6 BOWER'S MISSISSIPPI ACRES <br /> <br /> ITEM ESTIMATED QUANTITY UNIT PRICE EXTENSION <br /> <br /> I. COMHON EXCAVATION 1.00 LUMP SUH iO000.O0/LS $ 10000.00 <br /> 2. CLEARING & GRUBBING TREES 130.00 EACH 75.O0/EA 9750.00 <br /> 3. BITUMINOUS MATERIAL FOR MIXTURE ZO.O0 TON 165.00/T 11550.00 <br /> 4. BITUMINOUS SURFACING 1150.00 TON IO.O0/T 11500.00 <br /> 5. AGGRECATE BASE CLASS V 1650.00 TON 5.00/T 8250.00 <br /> 6. BITUMINOUS DRIVEWAY PAVEMENT 150.00 SQUARE YD 6.00/SY 900.00 <br /> Z. CONCRETE DRIVEWAY PAVEMENT 10.00 SQUARE YB 25.00/SY 250.00 <br /> 8. 12" RCP CLASS III 50.00 LINEAR FT 16.50/LF 825.00 <br /> 9. 15" RCP CLASS III 815.00 LINEAR FT 18.00/LF 14670.00 <br /> 10. 18" RCP CLASS III 470,00 LINEAR FT 20.20/LF 9494.00 <br /> 11. 24" RCP CLASS III 370.00 LINEAR FT 28.00/LF 10360.00 <br /> 12. 24" RCP FLARED END SECTION <br /> WITH TRASH QUARB 1.00 EACH 900.O0/EA 900.00 <br /> 13. MANHOLE 5.00 EACH 900.O0/EA 4500.00 <br /> 14. CATCH BASIN 3.00 EACH 750.O0/EA 2250.00 <br /> 15. TYPE II FILTER BLANKET 5.00 CUBIC YBS 40.O0/CY 200.00 <br /> 16. CLASS "C" RANDOM RIPRAP 15.00 CUBIC YDS 40.O0/CY 600,00 <br /> 17. CLASS "C°' GROUTED RIPRAP 2.00 CUBIC YDS 75.00/CY 150.00 <br /> 18. SOB 1000,00 SQUARE YD 1.60/SY 1600.00 <br /> 19. SEEDING 1000.00 SQUARE YD 0.35/SY 350.00 <br /> 20. MULCH 0.50 TON 300.00/T 150.00 <br /> <br /> TOTAL BIB SCHEDULE 5.000 - $ 9824%00 <br /> <br />BID SCHEDULE 6.000 <br />IHPROVEMENT PROJECT - 8?7 BONER'S MISSISSIPPI ACRES 2NB ADDITION <br /> <br /> ITEM <br /> <br /> l. GRADING <br /> 2, BITUMINOUS MATERIAL FOR MIXTURE <br /> 3, BITUMINOUS SURFACING <br /> 4. AGGREGATE BASE CLASS V <br /> <br />DID SCHEDULE 7.000 <br />IMPROVEMENT PROJECT - 82-8 DEERWOOD <br /> <br /> ITEM <br /> <br /> 1. GRADING <br /> 2. BITUMINOUS MATERIAL FOR MIXTURE <br /> 3. BITUMINOUS SURFACING <br /> 4. AGGREGATE BASE CLASS V <br /> 5. BITUMINOUS DRIVEWAY PAVEMENT <br /> 6. CHANNEL CLEANING <br /> Z. SEEDING <br /> 8. MULCH <br /> <br />ESTIMATED QUANTITY UNIT PRICE EXTENSION <br /> <br /> 5,00 ROAD STA 75.00/RD STA $ 375.00 <br /> 9.00 TON 165.00/T 1485.00 <br /> 150.00 TON IO.O0/T 1500.00 <br /> 250.00 TON 5.00/T 1250.00 <br /> <br /> TOTAL BID SCHEDULE 6.000 - $ 4610.00 <br /> <br />ESTIMATED QUANTITY UNIT PRICE EXTENSION <br /> <br /> 61.00 ROAD STA ZS.00/RD STA $ 4575.00 <br /> 100.00 TON 165.00/T 16500.00 <br /> 1650.00 TON IO.O0/T 16500.00 <br /> 1500.00 TON 5.00/T 7500.00 <br /> 50.00 SQUARE YB IO.O0/SY 500.00 <br /> 200.00 LINEAR FT 1.00/LF 200,00 <br /> 200.00 SQUARE FT 0.75/SF 150.00 <br /> 0.10 TON 300.O0/T 30.00 <br /> <br /> TOTAL Bib SCHEDULE 7.000 - $ 45?55.00 <br /> <br />BID SCHEDULE 8.000 <br />IMPROVEMENT PROJECT - 82-9 SHADY LAWN ESTATES <br /> <br /> ITEM ESTIMATED QUANTITY UNIT PRICE EXTENSION <br /> <br /> 1. GRADING 68.00 ROAD STA 75.00/RD STA $ 5100.00 <br /> 2. BITUMINOUS MATERIAL FOR MIXTURE 108.00 TON 165.00/T 17820.00 <br /> 3. BITUMINOUS SURFACING 1800.00 TON iO.O0/T 18000.00 <br /> 4. AGGREGATE BASE CLASS U 3100.00 TON 5,00/T 15500.00 <br /> 5. BITUMINOUS DRIVEWAY PAVEMENT 200.00 SQUARE YD 6.O0/SY 1200.00 <br /> 6. CHANNEL CLEANING 200,00 LINEAR FT 1.00/LF 200.00 <br /> 7, SEEDING 300.00 SQUARE YD 0,75/SY 225.00 <br /> 8. MULCH 0.10 TON 300.O0/T 30.00 <br /> 9. CULVERT CLEANING 6.00 EACH 75.00/EA 450.00 <br /> 10. 15" CMP 40.00 LINEAR FT 16.O0/LF 640.00 <br /> 11. 15" CMP APRONS 2.00 EACH ZS.00/EA 150.00 <br /> 12. COMMON BORROW 5000,00 CUBIC YDS 2.50/CY 12500.00 <br /> <br /> TOTAL BIB SCHEDULE 8.000 - $ 71815.00 <br /> <br />BID SCHEDULE 9.000 <br />IMPROVEMENT PROJECT - 82-10 PAVING CITY HALL PARKING LOT AND DRIVEWAY <br /> <br /> ITEH ESTIMATED QUANTITY <br /> <br /> 1, BITUMINOUS PARKING LOT SURFACING 2600.00 SQUARE YB <br /> <br />UNIT PRICE EXTENSION <br /> 3.40/SY $ 8840.00 <br /> $ 8840.00 <br /> <br />TOTAL BIB SCHEDULE 9.000 - <br /> <br /> <br />