My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 07/12/1982 - Special
Ramsey
>
Public
>
Agendas
>
Council
>
1982
>
Agenda - Council - 07/12/1982 - Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 12:31:15 PM
Creation date
5/20/2004 9:57:41 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Title
Special
Document Date
07/12/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
P~GE ! <br /> <br />BID TABULATION <br /> <br />JULY 12, 1982 <br /> <br />BIDDERS NAME: <br /> <br />A.R.I. CONTRACTING INC, <br /> <br />BID SCHEDULE l.OOO <br />IMPROVEMENT PROJECT 82-2 RODEO HILLS <br /> <br /> ITEM ESTIMATED QUANTITY <br /> <br /> 1. GRADING 61.00 ROAD STA <br /> 2. BITUMINOUS MAT. FOR MIXTURE 105.00 TON <br /> 3. BITUMINOUS SURFACING 1750.00 TON <br /> 4. AGGREGATE BASE CLASS U 2800.00 TON <br /> 5. BITUMINOUS DRIVEWAY PAVEMENT 100.00 SQUARE YD <br /> 6. DITCH GRADING & CHANNEL CLEANING 200.00 LINEAR FT <br /> 7. COMMON EXCAVATION 60O.OO CUBIC YDS <br /> 8. COMHON BORROW 600.00 CUBIC YDS <br /> 9. CULVERT CLEANING 6.00 EACH <br /> 10.ADJUST CULVERTS 2.00 EACH <br /> 11.SEEDING 300.00 SQUARE YDS <br /> 12.MULCH 0,10 TON <br /> 13.SOD 100.00 SQUARE YDS <br /> <br />UNIT PRICE <br /> <br /> IO0.O0/RB STA <br /> 155.00/T <br /> 10,25/T <br /> 5.30/T <br /> IO.O0/SY <br /> 1.00/LF <br /> 2.35/CY <br /> 2.35/CY <br /> IO0,O0/EA <br /> iO0.O0/EA <br /> O,ZO/SY <br /> 150.00/T <br /> 2.00/SY <br /> <br />TOTAL BID SCHEDULE 1,000 <br /> <br />BID SCHEDULE 2.000 <br />IMPROVEMENT PROJECT - 82-3 BARTHEL'S RUM RIVER ACRES <br /> <br /> ITEM ESTIMATED QUANTITY UNIT PRICE <br /> <br /> 1. GRADING 44.00 ROAD STA IO0.O0/RD <br /> 2. BITUMINOUS MATERIAL FOR MIXTURE 75.00 TON 155.00/T <br /> 3. BITUMINOUS SURFACING 1250.00 TON 10.25/T <br /> 4. AGGREGATE BASE CLASS U 2100.00 TON S.30/T <br /> 5. BITUMINOUS DRIVEWAY PAVEMENT 80.00 SQUARE YD IO.O0/SY <br /> 6. CONCRETE DRIVEWAY PAVEMENT 10.00 SQUARE YD 20.O0/SY <br /> Z. DITCH GRADING & CHANNEL CLEANING ZO0.O0 LINEAR FT 1.00/LF <br /> 8. CULVERT CLEANING 3.00 EACH IO0.O0/EA <br /> 9. 15" CMP 40,00 LINEAR FT 20.O0/LF <br /> 10. 18" CMP 50.00 LINEAR FT 22.00/LF <br /> 11. 18" CMP APRONS 2.00 EACH 75.00/EA <br /> 12. 15" CMP APRONS 2.00 EACH 70,O0/EA <br /> 13. INSTALL OWNER FURNISHED CULVERTS 1.00 EACH 200.O0/EA <br /> 14. SEED 400.00 SQUARE YB O.ZO/SY <br /> 15. MULCH 0.20 TON 150,O0/T <br /> <br />BID SCHEDULE 3,000 <br />IMPROVEMENT PROJECT - 82-4 <br /> <br /> ITEM <br /> <br /> 1. GRADING <br /> 2. BITUMINOUS MATERIAL FOR MIXTURE <br /> BITUMINOUS SURFACING <br /> 4. AGGREGATE BASE CLASS V <br /> 5. CHANNEL CLEANING <br /> CULVERT CLEANING <br /> <br />STA <br /> <br /> TOTAL BIB SCHEDULE 2.000 - <br /> <br />BOWER'S MISSISSIPPI ACRES 3RD ADDITION <br /> <br /> ESTIMATED QUANTITY UNIT PRICE <br /> <br /> 15,00 ROAD STA 100.00/RD STA <br /> 27,00 TON 155,00/T <br /> 450.00 TON I0.25/T <br /> 800.00 TON 5.30/T <br /> 200.00 LINEAR FT 1.00/LF <br /> 2.00 EACH IO0.O0/EA <br /> <br />BID SCHEDULE 4.000 <br />I~PROVEMENT PROJECT - 82-5 15?TH LANE NW <br /> <br /> ITEM <br /> <br /> 1. COMMON EXCAVATION <br /> <br /> 2. BITUMINOUS MATERIAL FOR MIXTURE <br /> 3. BITUMINOUS SURFACING <br /> 4. AGGREGATE BASE CLASS U <br /> BITUMINOUS DRIVEWAY PAVEMENT <br />6. CLEARING & GRUBBING TREES <br /> 7. 11" X 18" CMP <br /> 11" X 18" CMP APRON <br />~: 15" CMP <br />10. 15" CMP APRONS <br />11. SOD <br />12. SEED <br />1~. MULCH <br />14. CLASS A RANDOM RIPRAP <br /> <br />TOTAL BID SCHEDULE 3,000 - <br /> <br />ESTIMATED QUANTITY <br /> <br /> 1.00 LUMP SUM <br /> 50.00 TON <br /> 825.00 TON <br /> 1200.00 TON <br /> 30.00 SQUARE YD <br /> 15.00 EACH <br /> 46,00 LINEAR FT <br /> <br /> 2.00 EACH <br /> 200.00 SQUARE YD <br /> 200.00 SQUARE YD <br /> 0.10 TON <br /> I0,00 CUBIC YBS <br /> <br />UNIT PRICE <br /> <br /> 5000,O0/LS <br /> 155.00/T <br /> 10.25/T <br /> 5.30/T <br /> iO.O0/SY <br /> 60,O0/EA <br /> 20.O0/LF <br /> ZS.00/EA <br /> 20.O0/LF <br /> ZO.O0/EA <br /> 2.00/SY <br /> O.70/SY <br /> 150.00/T <br /> 60.O0/CY <br /> <br />TOTAL BIB SCHEDULE 4.000 - <br /> <br /> EXTENSION <br /> <br />$ 6100,00 <br />16275.00 <br />17937.50 <br />14840.00 <br />1000,00 <br />200.00 <br />1410,00 <br />I410.00 <br />600,00 <br />2O0.0O <br />210.00 <br />15.00 <br />200,00 <br /> <br />$ 60397.50 <br /> <br /> EXTENSION <br /> <br />$ 4400.00 <br /> 11625.00 <br /> 12812.50 <br /> 11130,00 <br /> 800.00 <br /> 200.00 <br /> ZOO.O0 <br /> 300.00 <br /> 800.00 <br /> 1100.00 <br /> 15Q.00 <br /> 140.00 <br /> 200,00 <br /> 280.00 <br /> 30,00 <br /> <br />$ 44667,50 <br /> <br /> EXTENSION <br /> <br />$ 1500.00 <br /> 4185.00 <br /> 4612.50 <br /> 4240,00 <br /> 200.00 <br /> 200.00 <br /> <br />$ 14937.50 <br /> <br /> EXTENSION <br /> <br />$ 5000.00 <br /> 7750,00 <br /> 8456,25 <br /> 6360.00 <br /> 300.00 <br /> 900.00 <br /> 920.00 <br /> <br /> 140.00 <br /> 400.00 <br /> 140.00 <br /> 15.00 <br /> 600.00 <br /> <br />$ 32131,25 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.