Laserfiche WebLink
,BID SCHBBULE 5.000 <br />IHPROVEMENT PROJECT - 8?6 BOWER'S MISSISSIPPI ACRES <br /> <br /> ITEM ESTIMATED QUANTITY <br /> <br /> 1. COMHON EXCAVATION 1.00 LUMP SUM <br /> 2. CLEARING & GRUBBING TREES 130.00 E~H <br />3. BITUMINOUS MATERIAL FOR MIXTURE 70.00 TON <br />4. BITUMINOUS SURFACING 1150.00 TON <br />5. AGGREGATE BASE CLASS U 1650.00 TON <br />6. BITUMINOUS DRIVEWAY PAVEMENT 150.00 SQUARE YD <br />7. CONCRETE DRIVEWAY PAVEMENT 10.00 SQUARE YD <br />8. 12" RCP CLASS III 50,00 LINEAR FT <br />9. 15" RCP CLASS III 815.00 LINEAR FT <br />10.18" RCP CLASS III 470,00 LINEAR FT <br />11.24" RCP CLASS III 370.00 LINEAR FT <br />12.24" RCP FLARED END SECTION <br /> WITH TRASH GUARD 1.00 EACH <br />13. MANHOLE 5.00 EACH <br />14. CATCH BASIN 3,00 EACH <br />15, TYPE II FILTER BLANKET S.O0 CUBIC YDS <br />16. CLASS "C" RANDOM RIPRAP 15.00 CUBIC YDS <br />17. CLASS "C" GROUTED RIPRAP 2.00 CUBIC YDS <br />18. SOD 1000.00 SQUARE YD <br />19. SEEDING 1000.00 SQUARE YD <br />20. MULCH 0.50 TON <br /> <br />UNIT PRICE <br /> <br /> Z500.OO/LS <br /> 35.00/EA <br /> 160.00/T <br /> !1.70/T <br /> 5.65/T <br /> 4.00/SY <br /> 30.O0/SY <br /> 18.00/LF <br /> 20.O0/LF <br /> 22.00/LF <br /> 28.00/LF <br /> <br /> 8OO.O0/EA <br /> 900.O0/EA <br /> 680.O0/EA <br /> I5.00/CY <br /> 40.O0/CY <br /> 50.00/CY <br /> 1.75/SY <br /> 0.70/SY <br /> 140.00/T <br /> <br />TOTAL BID SCHEDULE 5.000 - <br /> <br />BID SCHEDULE 6,000 <br />I~PROVEMENT PROJECT - 82-7 BOWER'S MISSISSIPPI ACRES 2ND ADDITION <br /> <br /> ITEM <br /> <br /> 1. GRADING <br /> 2. BITUMINOUS MATERIAL FOR MIXTURE <br /> 3. BITUMINOUS SURFACING <br /> 4. AGGREGATE BASE CLASS U <br /> <br />BID SCHEDULE 7,000 <br />IMPROVEMENT PROJECT - 82-8 DEERWOOD <br /> <br /> ITEM <br /> <br /> 1. GRADING <br /> <br />2. BITUMINOUS MATERIAL FOR MIXTURE <br />3, BITUMINOUS SURFACING <br />4, AGGREGATE BASE CLASS V <br />5. BITUMINOUS DRIVEWAY PAVEMENT <br />6, CHANNEL CLEANING <br />7. SEEDING <br />8. MULCH <br /> <br />PAGE 2 <br /> <br /> EXTENSION <br /> <br />$ 7500.00 <br />4550.00 <br />11200,00 <br />13455.00 <br />9322.50 <br />600.00 <br />300,00 <br />900,00 <br />16300.00 <br />10340.00 <br />10360.00 <br /> <br /> 800.00 <br /> 4500,00 <br /> 2040.00 <br /> 75.00 <br /> 600,00 <br /> 100.00 <br /> 1750.00 <br /> 700.00 <br /> 70,00 <br /> <br />$ 95462.50 <br /> <br />BID SCHEDULE 9.000 <br />IMPROVEMENT PROJECT - 82-10 PAVING CITY HALL PARKING LOT AND DRIVEWAY <br /> <br /> ITEM ESTIMATED QUANTITY <br /> <br /> 1. BITUMINOUS PARKING LOT SURFACING 2600.00 SQUARE YD <br /> <br />BID SCHEDULE 8.000 <br />IMPROVEMENT PROJECT - 82-9 SHADY LAWN ESTATES <br /> <br /> ITEM ESTIMATED QUANTITY UNIT PRICE EXTENSI0N <br /> <br /> I. GRADING 68,00 ROAD STA 60.O0/RD STA $ 4080,00 <br /> 2. BITUMINOUS MATERIAL FOR HIXTURE 108.00 TON 160.00/T 1Z280,00 <br /> 3. BITUMINOUS SURFACING 1800.00 TON li.ZO/T 21060.00 <br /> 4. AGGREGATE BASE CLASS V 3100.00 TON 5.65/T 17515.00 <br /> 5. BITUMINOUS DRIVEWAY PAVEMENT 200.00 SQUARE YD 4.00/SY 800.00 <br /> 6. CHANNEL CLEANING 200.00 LINEAR FT 3.00/LF 600.00 <br /> 7. SEEDING 300.00 SQUARE YD O.ZO/SY 210.00 <br /> 8. MULCH 0,10 TON 140.O0/T 14,00 <br /> 9. CULVERT CLEANING 6,00 EACH IO0.O0/EA 600.00 <br /> 10. 15" CMP 40.00 LINEAR FT 18.60/LF 744.00 <br /> 11. 15" CMP APRONS 2.00 EACH IO0.O0/EA 200.00 <br /> 12, COMMON BORROW 5000,00 CUBIC YDS 2.00/CY 10000.00 <br /> <br /> TOTAL BID SCHEDULE 8.000 - $ 73103.00 <br /> <br />UNIT PRICE EXTENSION <br /> 2,ZS/SY $ Z150,00 <br /> $ 7150.00 <br /> <br />TOTAL BID SCHEDULE 9.000 - <br /> <br />ESTIMATED QUANTITY UNIT PRICE EXTENSION <br /> <br /> 61.00 ROAD STA 60.O0/RD STA $ 3660.00 <br /> 100.00 TON I60,00/T 16000.00 <br /> 1650.00 TON I1.70/T 19305,00 <br /> 1500.00 TON 5.65/T 8475.00 <br /> 50.00 SQUARE YD 4.00/SY 200,00 <br /> 200.00 LINEAR FT 3.00/LF 600.00 <br /> 200.00 SQUARE FT 0.10/SF 20.00 <br /> 0.10 TON 140.00/T 14.00 <br /> <br /> TOTAL BID SCHEDULE 7.000 - $ 48274.00 <br /> <br />ESTIMATED QUANTITY UNIT PRICE EXTENSION <br /> <br /> 5.00 ROAD STA 60.O0/RD STA $ 300.00 <br /> 9.00 TON i60.00/T I440.00 <br /> 150,00 TON · 11,ZO/T 1Z55,00 <br /> 250,00 TON 5.65/T 1412.50 <br /> <br /> TOTAL BID SCHEDULE 6.000 - $ 4907.50 <br /> <br /> <br />