|
DI ,-SCHEDULE 5.O00 PAGE 2
<br />.IMPROVE,TNT PRO ECT- 8>6 BO ER'S MISSISSIPPI ACRES
<br />
<br /> ITEM ESTIMATED UANTIT UNIT PRICE EXTENSIO,
<br />
<br /> 1. COMMON EXCAVATION 1.00 LUHP SUM 4400.00/LS ~ 4400,00
<br /> 2, CLEARING & GRUBBING TREES 130,00 EACH 55,O0/EA /150,00
<br /> 3, BITUMINOUS MATERIAL FOR MIXTURE ZO,O0 TON 172.00/T 12040,00
<br /> q. BITUMINOUS SURFACING 1150.00 TON 10.55/T 12132,50
<br /> 5, A~GREGATE BASE CLASS V 1650,00 TON 4.55/T 7507,50
<br /> 6. BITUMINOUS DRIVEWAY PAVEMENT 150.00 SQUARE YD 6.00/SY 900.00
<br /> 7, CONCRETE DRIVEWAY PAVEMENT 10.00 SQUARE YD 28,00/SY 280,00
<br /> 8. 12" RCP CLASS III 50.00 LINEAR FT lg,00/LF 950,00
<br /> 9, i5" RCP CLASS III 815.00 LINEAR FT 21.00/LF 17115.00
<br /> 10, 18" RCP CLASS III 470,00 LINEAR FT 23,00/LF 10810.00
<br /> 11. 24" RCP CLASS III 370,00 LINEAR FT 27.25/LF 10082.50
<br /> 12. 24" RCP FLARED END SECTION
<br /> WITH TRASH ~UARD 1.60 EACH 660.O0/EA 660.00
<br /> 13. MANHOLE 5,00 EACH 7/O,O0/EA 3850.00
<br /> 1~,CATCH BASIN 3,00 EACH 575,00/EA 1725,00
<br /> 15,TYPE II FILTER BLANKET 5.00 CUBIC YDS 11.00/CY 55,00
<br /> 16,CLASS "C" RANDOM RIPRAP 15,00 CUBIC YDS 5O,OO/CY 750,00
<br /> I7.CLASS "C" GROUTED RIPRAP 2.00 CUBIC YDS 51,60/CY 103.20
<br /> 18.SOD 1000,00 SQUARE YD 1,60/SY 1600,00
<br /> 19.SEEDING I000.00 SQUARE YD I.iO/SY 1100.00
<br /> 20,MULCH 0,50 TON t40,00/T 70,00
<br />
<br /> TOTAL BIB SCHEDULE 5,000 - $ 93280,70
<br />
<br />BIO SCHEDULE 6.000
<br />IHPROVEMENT PROJECT - 82-7 DOWER'S HISSISSIPPI ACRES 2ND ADDITION
<br />
<br /> ITEM ESTIHATEB QUANTITY
<br />
<br /> 1. GRADING 5.00 ROAD STA
<br /> 2. BITUMINOUS HATERIAL FOR HIXTURE 9.00 TON
<br /> 3. BITUMINOUS SURFACING
<br /> 4. AGGREGATE BASE CLASS V
<br />
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />I
<br />
<br />BIB SCHEDULE 7.000
<br />IMPROVEMENT PROJECT - 82-8 DEERWOOD
<br />
<br /> ITEM
<br />
<br /> I. GRADING
<br /> 2. BITUHINOUS HATERIAL FOR HIXTURE
<br /> BITUMINOUS SURFACING
<br /> 4, AGGREGATE BASE CLASS V
<br /> 5. BITUHINOUS DRIVEWAY PAVEMENT
<br /> 6. CHANNEL CLEANING
<br /> Z. SEEDING
<br /> 8. HULCH
<br />
<br />DID SCHEDULE 8.000
<br />IMPROVEMENT PROJECT - 82-9 SHADY LAWN ESTATES
<br />
<br /> ITEH
<br />
<br /> 1. GRADING
<br /> 2, BITUMINOUS MATERIAL FOR MIXTURE
<br /> BITUHINOUS SURFACING
<br /> 4. AGGREGATE BASE CLASS V
<br /> S. BITUHINOUS DRIVEWAY PAVEHENT
<br /> 6. CHANNEL CLEANING
<br /> 7. SEEDING
<br /> 8. NULCH
<br /> C~LVERT CLEANING
<br /> 10. 15" CMP
<br /> 11. 15" CMP APRONS
<br /> 12. COMMON BORROW
<br />
<br /> UNIT PRICE EXTENSION
<br />
<br /> 125.00/R~ STA $ 625.00
<br /> 1Z2.00/T 1548.00
<br />150.00 TON 11.55/T 1732.50
<br />250.00 TON 5.55/T 1387,50
<br />
<br /> TOTAL BIB SCHEDULE 6.000 - $ 5293,00
<br />
<br />ESTIMATED QUANTITY UNIT PRICE EXTENSION
<br />
<br /> 61.00 ROAD STA IO0.O0/RD STA $ 6100.00
<br /> lO0.OO TON 172,00/T 17200.00
<br /> 1650.00 TON I0.55/T 17407.50
<br /> 1500.00 TON 4.55/T 6825.00
<br /> 50.00 SQUARE YD 7.O0/SY 350.00
<br /> 200.00 LINEAR FT 3.~O/LF 660,00
<br /> 200.00 SQUARE FT 1.10/SF 220.00
<br /> 0.10 TON 140.00/T 14.00
<br />
<br /> TOTAL BIO SCHEDULE 7.000 - $ 48776,50
<br />
<br />UNIT PRICE EXTENSION
<br /> 3.15/SY $ 8190.00
<br /> S 8190.00
<br />
<br />TOTAL BID SCHEDULE 9,000 -
<br />
<br />BID SCHEDULE 9.000
<br />IHPROVEMENT PROJECT - 82-10 PAVING CITY HALL PARKING LOT AND DRIVEWAY
<br />
<br /> ITEH ESTIHATED OUANTITY
<br />
<br /> 1. BITUHINOUS PARKING LOT SURFACING 2600.00 SQUARE YB
<br />
<br />ESTIMATED QUANTITY UNIT PRICE EXTENSION
<br />
<br /> 68.00 ROAD STA IO0.O0/RD STA $ 6800.00
<br /> 108.00 TON iZ2.00/T 18576.00
<br /> 1800.00 TON 10.55/T 18990.00
<br /> 3100.00 TON 4.55/T 14105.00
<br /> 200.00 SQUARE YD 6.00/ST 1200.00
<br /> 200.00 LINEAR FT 3.30/LF 660.00
<br /> ~00.00 SQUARE YD I.IO/SY 330.00
<br /> 0.I0 TON lqO.OO/T 14.00
<br /> 6.00 EACH tlO.O0/EA 660.00
<br /> 40.00 LINEAR FT 20.O0/LF 800.00
<br /> 2.00 EACH IO4.00/EA 208.00
<br /> 5000.00 CUBIC YDS 2.SO/CY 12500.00
<br />
<br /> TOTAL BID SCHEDULE 8.000 - $ 74843.00
<br />
<br />
<br />
|