Laserfiche WebLink
m <br /> <br /> TABLE I <br />ESTIMATED COSTS BOWER'S MISSISSIPPI ACRES <br /> <br /> Item <br /> <br /> Bituminous Surfacing <br />IClass V Gravel <br /> Grading & Clearing <br /> Storm Sewer <br /> <br />Estimated Quant.ity <br /> <br />Estimated Cost <br /> <br />1,100 Tons <br />1,700 Tons <br /> 1 Lump Sum <br /> 1 Lump Sum <br /> <br />$25,300.00 <br /> 9,800.00 <br /> 20,000.00 <br /> 46~450.00 <br /> <br />Estimated Construction Cost <br />Contingencies, Engineering, Administrative & Easements <br /> <br />$101,550.00 <br /> 28~000.00 <br /> <br />ESTIMATED PROJECT COST <br /> <br />$129,550.00 <br /> <br /> TABLE I I <br />COST S IPMMARY <br /> <br />BO%~R'S MISSISSIPPI ACRES <br /> <br />Total Oost <br />Total Units Assessed <br />Assessed Cost Per Unit <br />Annual Unit Cost (10 Years)* <br /> <br />* Based on 13 percent interest. <br /> <br />$129,550.00 <br /> 61 <br /> $2,123.77 <br /> $391.42 <br /> <br /> TABLE III <br />ESTIMATED COSTS BOWER'S MISSISSIPPI ACRES SECOND ADDITION <br /> <br />Item <br /> <br />Estimated qu~qtity <br /> <br />Estimated Cost <br /> <br />ituminous Surfacing <br />lass V Gravel <br />rading and Shaping <br /> <br />150 Tons <br />250 Tons <br /> 1 Lump Sum <br /> <br />$3,450.00 <br /> 1,450.00 <br /> 1,100.00 <br /> <br />m <br /> <br />Estimated Construction Cost <br />Contingencies, Engineering & Administrative <br /> <br />$6,000.00 <br />1,500.00 <br /> <br />ESTIMATED PROJECT COST <br /> <br /> TABLE IV <br /> COST SUMMARY <br /> <br /> BOWER'S MISSISSIPPI ACRES SECOND ADDITION <br /> <br />$7,500.00 <br /> <br />! <br />! <br /> <br />Total Cost <br />Total Units Assessed <br />Assessed Cost Per Unit <br />Annual Unit Cost (10 Years)* <br /> <br />Based on 13 percent interest. <br /> <br />$7,500.00 <br />6 <br />$1,250.00 <br /> $230.38 <br /> <br /> <br />