Laserfiche WebLink
I <br />I <br />I <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br />I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> <br /> TABLE II <br />PROPOSED TYPICAL ASSESSMENTS <br /> <br />RURAL STREET <br /> <br />Commercial Lot <br /> <br />Front Foot Cost <br />Typical Lot Cost (330' wide) <br />An~al Lot Cost <br /> <br /> TABLE III <br /> COST SUMb~RY <br /> RURAL STREET <br /> <br />Total Estimated Project Costs <br />Proposed Financing <br /> <br />Commercial Assessments <br />1350 Front Feet x $21.00 <br /> <br />MSA Funds or City Funds <br /> <br /> TOTAL FINANCED COST <br /> <br /> TABLE IV <br />ESTIMATED COSTS <br /> <br />URBAN STREET <br /> <br />I tern <br /> <br />Excavation, Embankment, and Unsuitable <br /> Soil Removal <br />Gravel Surfacing <br />Concrete Curb and Gutter <br />Bituminous Base Course <br />Bituminous Wear Course <br />Restoration <br />Turning and Bypass Lanes (S.T.H. 47) <br />Storm Sewer and Drainage Improvements <br />TOTAL CONS'~RUCTION COST <br />Contingencies, Engineering, Administrative, <br />Right of Way Acquisition <br /> <br />TOTAL ESTIMATED COST PHASE I <br /> <br />$ 21.00 <br />$6,930.00 <br />$1,277.20 <br /> <br />$275,275.00 <br /> <br />$ 28,350.00 <br />$246,925.00 <br />$275,275.00 <br /> <br />Estimated Cost <br /> <br />$ 54,550 <br /> 41,250 <br /> 59,225 <br /> 57,375 <br /> 65,025 <br /> 11,000 <br /> 12,350 <br /> 37,750 <br /> $338,525 <br /> <br />84,625 <br /> <br />$423,150 <br /> <br /> <br />