My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/22/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 03/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:48:16 PM
Creation date
3/23/2016 8:59:14 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/22/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
437
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Program <br />City of Ramsey, Minnesota <br />2016 dim 2020 <br />Project # 16 -STM -001 <br />Project Name Pond Outlet for Business Park 95 <br />Type Improvement <br />Useful Life 20 Years <br />Category Storm Water Utility Improveme <br />Department Stoimwater Utility <br />Contact <br />Status Active <br />Description <br />Total Project Cost: $332,500 <br />This project will provide an outlet for an existing pond in Business Park 95. The City developed this plat in 1995. A natural low area was left for <br />stormwater ponding. A neighboring property proposed adding on to their building. During the plan review process it was determined that the <br />ponding area was not large enough. <br />Justification <br />The City developed the project. The ponding area did not have an outlet and the City stated that an outlet would be developed in the future. The <br />ponding area was intended to serve all of the plat. The recent building expansion highlighted the need for expanded storage and an outlet from <br />the pond. The lack of an outlet means the pond has to be oversized to hold 2 100 -year storms. The City completed an outlet to the Mississippi <br />River from the eastern side of this plat with the Sunfish Lake Blvd expansion project. This project will extend storm sewer from this existing <br />pond to the existing storm sewer, providing an outlet from the pond. <br />Expenditures <br />2016 2017 2018 2019 2020 Total <br />Improvements Other than 332,500 <br />Building Cost <br />332,500 <br />Funding Sources <br />Total 332,500 <br />332,500 <br />2016 2017 2018 2019 2020 Total <br />Storm Water Management 110,833 <br />Fund <br />Storm Water Utility Fund 221,667 <br />110,833 <br />221,667 <br />Total 332,500 332,500 <br />135 <br />
The URL can be used to link to this page
Your browser does not support the video tag.