Laserfiche WebLink
Capital Improvement Program <br />City of Ramsey, Minnesota <br />2016 dim 2020 <br />Project # 16 -STM -001 <br />Project Name Pond Outlet for Business Park 95 <br />Type Improvement <br />Useful Life 20 Years <br />Category Storm Water Utility Improveme <br />Department Stoimwater Utility <br />Contact <br />Status Active <br />Description <br />Total Project Cost: $332,500 <br />This project will provide an outlet for an existing pond in Business Park 95. The City developed this plat in 1995. A natural low area was left for <br />stormwater ponding. A neighboring property proposed adding on to their building. During the plan review process it was determined that the <br />ponding area was not large enough. <br />Justification <br />The City developed the project. The ponding area did not have an outlet and the City stated that an outlet would be developed in the future. The <br />ponding area was intended to serve all of the plat. The recent building expansion highlighted the need for expanded storage and an outlet from <br />the pond. The lack of an outlet means the pond has to be oversized to hold 2 100 -year storms. The City completed an outlet to the Mississippi <br />River from the eastern side of this plat with the Sunfish Lake Blvd expansion project. This project will extend storm sewer from this existing <br />pond to the existing storm sewer, providing an outlet from the pond. <br />Expenditures <br />2016 2017 2018 2019 2020 Total <br />Improvements Other than 332,500 <br />Building Cost <br />332,500 <br />Funding Sources <br />Total 332,500 <br />332,500 <br />2016 2017 2018 2019 2020 Total <br />Storm Water Management 110,833 <br />Fund <br />Storm Water Utility Fund 221,667 <br />110,833 <br />221,667 <br />Total 332,500 332,500 <br />135 <br />