Laserfiche WebLink
,I <br /> I <br /> ! <br />I <br /> I <br /> I <br /> i <br /> I <br /> I <br /> I <br /> i <br /> I <br /> I <br /> I <br /> I <br /> i <br /> I <br /> I <br /> I <br /> <br />con~. ultirg <br />engineers <br />diversified <br />InC, ~ <br /> <br />Main Office: P.O. Box J, Osseo, Minnesota 55369 (612) 425-2181 <br />S~uth Office: 8500 210th St, W., Lakevllle, Minnesota 55044 ([612) 469-3881 <br /> <br />September 2, 1981 <br /> <br />Honorable Mayor and City Council <br />City of Ramsey <br />15153 Nowthen Boulevard N.W. <br />Anoka, Minnesota 55303 <br /> <br />Re: Improvement Projects 81-4, 81-6, 81-9, 81-10, 81-19 & 81-20 <br /> Street Construction <br /> <br />Dear Council Members: <br /> <br />In accordance to your advertisement for bids on the above referenced projects, <br />two bids were received and opened at 11:00 a.m. on August 31, 1981. <br /> <br />The bids were as follows: <br /> <br /> Contractor <br /> <br />N.D.H., Inc. <br />Buffalo Bituminous Co. Inc. <br /> <br />Total Base Bid <br /> <br /> $497,986.00 <br /> $617,500.00 <br /> <br />Alt. Bid.#1 <br /> <br />Alt. Bid #2 <br /> <br />$507,578.50 <br />$628,750.00 <br /> <br />Alt. Bid~#3 <br /> <br />$535,971.50 <br />$663,890.00 <br /> <br />The engineer's estimated construction cost for the base bid as shown in the feasibility <br />reports for the projects was $545,100. The total low bid received is approximately 9% <br />below the engineer's estimate. <br /> <br />The base bid of $497,986 covers the construction of those streets ordered for upgrading <br />by the City Council prior to .or at their July 28, 1981 council meeting. Alternate <br />bid number one includes the base bid plus the construction of the entire portions of <br />169th Lane N.W., 173rd Ave. N.W. and Driscoll St. N.W. in Improvement Project No. <br />81-19 as ordered at the August 18, 1981 council meeting. Alternate bid number 2 <br />includes the base bid plus the construction of 153rd Lane N.W. in Improvement Project <br />No. 81-20. This street has not been ordered for paving and would require another <br />public hearing prior to proceeding with the construction. The final alternate <br />includes the base bid plus both of the additions made in alternate bids numbers 1' <br />and 2. <br /> <br />Following is a sugary of the projects on an individual basis: <br /> <br />civil · municipal · planning · environmental · land surveying · geotechnlcs · waste treatment <br /> <br /> <br />