Laserfiche WebLink
I <br /> I <br /> I <br /> I <br /> I <br />I <br /> I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />i <br />I <br /> <br />Hebron, ND <br /> <br />Moorhead, MN <br /> <br />Sauk Rapids, MN <br /> <br />· Install GCPs and <br /> gates <br /> <br />· Siding changes <br /> <br />· Fencing right of way <br /> <br />· Install power switch <br /> <br />· Install GCPs <br /> <br />· Increase allowable <br /> train speed <br /> <br />· Establish a rescue <br /> squad. <br /> <br />· Establish ambulance/ <br /> railroad communica- <br /> tion system <br /> <br />· Improve intersection <br /> <br />· Establish a rescue <br /> squad <br /> <br />· Establish ambulance/ <br /> railroad comunica- <br /> tion system <br /> <br />· Install GCPs and <br /> gates <br /> <br />Installed, <br /> <br />Deferred by BN because of <br />economic downturns. <br /> <br />Eliminated as a demonstra- <br />tion project. <br /> <br />Installed. <br /> <br />Installation by August 1. <br /> <br />Is now being increased at <br />a gradual rate <br /> <br />Established. <br /> <br />Funding may be provided <br />by the City. <br /> <br />Scheduled for completion <br />by this fall. <br /> <br />Project has been dropped <br />due to lack of fun4s. <br />Similar project in Moor- <br />head will be evaluated. <br /> <br />Funding expected from the <br />City. To be implemented <br />in the fall. <br /> <br />To be completed in the <br />fall. <br /> <br />RAIL STUDY NEWSLETTER P. 3 <br /> <br /> <br />