My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Environmental Policy Board - 02/22/2016
Ramsey
>
Public
>
Agendas
>
Environmental Policy Board
>
2016
>
Agenda - Environmental Policy Board - 02/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 11:55:24 AM
Creation date
4/4/2016 11:56:25 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Environmental Policy Board
Document Date
02/22/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
wetland boundary, so in most cases these LRRWMO wetland protection standards impose no new <br />restrictions after construction. <br />Occasionally a wetland boundary may be outside of the drainage and utility easement. The <br />16.5 -foot wide area of LRRWMO wetland protections would be outside of the normal drainage <br />and utility easement. In these cases, the drainage and utility easement should be expanded to <br />encompass the area within 16.5 feet from the wetland edge. <br />Variances <br />A variance may be granted in the following circumstances: <br />• For public road projects whenever the road right of way does not provide sufficient space to <br />implement the wetland protections. <br />• Whenever the permitting authority determines substitute activities will be used that will <br />provide the same level of protection. <br />• Other factors, as determined by the permitting authority. <br />Performance Surety <br />A performance surety will be collected to ensure the proper execution of wetland protection <br />measures. The surety may be used to correct any deficiencies. Performance sureties shall be <br />collected by the city, except in cases of wetland mitigation when the LRRWMO will collect the <br />surety. Any surety shall be returned at completion of the construction process and proper execution <br />of wetland protection measures. <br />The performance surety will be waived for public projects. <br />Comprehensive Watershed Management Plan <br />Lower Rum River Watershed Management Organization <br />October 2011 <br />G-7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.