My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Environmental Policy Board - 03/21/2016
Ramsey
>
Public
>
Agendas
>
Environmental Policy Board
>
2016
>
Agenda - Environmental Policy Board - 03/21/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/19/2025 11:55:30 AM
Creation date
4/4/2016 12:00:18 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Environmental Policy Board
Document Date
03/21/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Review File: The Station <br />Preliminary Plat Review: Landscaping <br />March 14, 2016 <br />Page 2 of 2 <br />• Upon acceptance of landscaping by City, a two (2) year maintenance guarantee is <br />required to ensure survival of all tree/shrub plantings. <br />• The project is subject to the City's topsoil requirement, which states that all disturbed <br />areas not otherwise improved with walkways, driveway, home and other impervious <br />surfacing, shall receive four (4) inches of topsoil meeting the City's topsoil <br />specification, including boulevard areas. A topsoil inspection is required prior to <br />landscaping being installed and copies of the load tickets are required as well. This is <br />reviewed at time of Building Permit Application and request for Certificate of <br />Occupancy. Please update the Landscape Installation Notes to include this requirement. <br />• Details shall be provided on the proposed entrance/monument sign. A separate Sign Permit <br />will be required prior to sign installation. <br />Please submit a revised landscaping plan that addresses these matters. <br />Tree Preservation: This site is devoid of any significant tree cover and therefore, no tree <br />preservation plan is necessary. <br />Best Management Practices (BMPs): Storm water volume requirements were accommodated <br />through a regional system for The COR (and is a focal point nowforThe Draw and Amphitheater area). <br />The City is currently exploring a regional solution to address the Lower Rum River Water Management <br />Organization's (LRRWMO) infiltration requirement. On site, this project is proposing ponding to <br />address certain storm water management requirements. Two (2) different seed mixes will be utilized <br />to establish vegetation around the pond, including both xeric and mesic native grasses and <br />wildflowers. The proposed mixes will provide some seasonal interest in the form of blooms and will <br />also provide pollinator friendly habitat as well. <br />
The URL can be used to link to this page
Your browser does not support the video tag.