Laserfiche WebLink
Table 3 - Implementation Plan <br />1.0 <br />HIGHWAY 10 ACCESS PLANNING STUDY <br />$390,000 $390,000 Immediate pedestrian safety improvements targeting key deficiencies I Temporary (throw <br />away) <br />$2,700,000 $5,000,000 <br />Continuous local connection from Thurston to Main on N side of TH 10 I Dependent upon ROW <br />acquisition <br />$8,800,000 $9,600,000 Significant safety and mobility improvements on WB Hwy 10 I Provide pedestrian <br />accommodations prior to Fair Oak signal removal <br />$1,300,000 $3,000,000 <br />Continuous local connection from Sunfish to Thurston on N side of TH 10 I Closes 11 access <br />points on TH 10 <br />$6,700,000 $11,600,000 Continuous local connection from Ramsey to Sunfish on N side of TH 10 I Closes 26 access <br />points on TH 10 <br />$800,000 $1,100,000 Continuous local connection from Armstrong to Ramsey Blvd on 5 side of TH 10 I Closes 1 <br />access point on TH 10 <br />b <br />N <br />v, <br />v <br />y <br />Continuous local connection from Cutters Grove to Main I Needs to be complete prior to <br />improvements at Thurston and TH 10 <br />Dependent upon ROW acquisition, property owner meeting I Closes 11 access points on TH 10 <br />$16M for WB Flyover I $26.2 M for Thurston Overpass <br />$11 for WB Flyover up to $19.2 for EB and WB Flyover <br />$11.4 for WB Flyover up to $23.9 for High T with Local Overpass with RI/R0 <br />EB Flyover or High -T with Local Overpass <br />N <br />{{ Oyu <br />v <br />y <br />Longterm access to properties not viable I Continue to purchase properties as opportunities <br />present themselves <br />Development driven <br />County working on plan to grade separate all major at -grade BNSF crossings <br />County working on plan to grade separate all major at -grade BNSF crossings <br />Continue to monitor the safety of access on TH 10 <br />Continue to monitor the safety of access on TH 10 <br />Continue to monitor the safety of access on TH 10 <br />Continue to monitor the safety of access on TH 10 <br />1-1-5 Riverdale Blvd extension to Bowers Dr MA/ LOCAL / PRIV /TED $500,000 $200,000 $1,300,000 $2,000,000 Continue to monitor the safety of access on TH 10 <br />Subtotal $44,1M <br />I <br />0 <br />e <br />n <br />M <br />M <br />M <br />2 <br />N <br />m 2 <br />$11.4M - $23.9M <br />$0 or $23M - $26M <br />0 <br />1 <br />M <br />M <br />1 <br />V. <br />M <br />M <br />M <br />M <br />M <br />0 <br />Y <br />72 <br />6 <br />Subarea 5 Short term pedestrian improvements I Median harrier with fence I Select trail connections (Verndale to TH/MA $0 $0 <br />Fairoak - north side and Fairoak to Main - south side) <br />5-1-1 Construct Greenhaven Pkwy from Thurston Ave to Main St I New intersection on Thurston Ave (signal or MA / TIF / LOf31L/MSAS $2,200,000 $100,000 <br />roundabout) I Remove all -way stop on Thurston Ave <br />Reduced conflict intersection at Fairoak Ave I Frontage Road from Cutters Grove to Fairoak Ave I TAP / TH / HSIP / COC/ CIMS / <br />5-1-2a Pedestrian overpass near Verndale Avenue CMAQ/ LOCAL/ MA / MSAS $800,000 $0 <br />4-1-2E North Frontage Rd from Sunfish Lake Blvd to Anoka Tech MA / LOCAL / MSAS / RALF $800,000 $900,000 <br />3-1-4 Realign TH 10 between Ramsey Blvd and Sunfish Lake Blvd I Construct North Frontage Rd MA /LOCAL/RALF / MSAS / TH / $1,900,000 $3,000,000 <br />4-1-2W CIMS <br />3-1-1 South Frontage Rd extension from Traprock St to Ramsey Blvd MA / LOCAL / MSAS / PRIV $300,000 $0 <br />IN <br />a°1 <br />00 <br />a <br />M <br />00- <br />M <br />M <br />LOCAL / HSIP / MA / MSAS / TH / <br />CSAH <br />MA / LOCAL / MSAS / PRIV / TH <br />CIMS / COC / HSIP / LOCAL / MA / <br />TED / MSAS / RALF <br />Subtotal <br />STP/CIMS/COC/HSIP/LOCAL/ <br />MA / TED / MSAS / RALF / CSAH <br />STP/CIMS/COC/HSIP/LOCAL/ <br />MA / TED / MSAS / RALF / CSAH <br />CIMS/COC/HSIP/LOCAL/ MA/ <br />TED / MSAS / RALF <br />RALF / TH <br />LOCAL/ PRIV <br />CIMS / CSAH / CTIB / HSIP / LOCAL <br />/ MSAS / RR / STP / TIGER <br />CIMS / CSAH / CTIB / HSIP / LOCAL <br />/ MSAS / RR / STP / TIGER <br />MA / LOCAL / PRIV <br />MA / LOCAL / PRIV <br />HSIP / MA/ LOCAL / TH / MSAS <br />HSIP / MA/ LOCAL / TH / MSAS <br />Extension of south frontage road from Fairoak Ave to Main St I Roundabout at Main St interchange I <br />Removal of TH 10 NBL access at south Fairoak Ave <br />Extend Riverdale Dr east of Tungsten I New right in/right out access on TH 10 I Remove driveways on <br />eastbound TH 10 between Sunfish Lake Blvd and Tungsten St <br />Grade separation treatment at Thurston Avenue (westbound flyover, High T, eastbound and westbound <br />flyover, or overpass with RI/RO) I Complete N frontage rd to west <br />Grade separation treatment at Sunfish Lake Blvd (westbound flyover, High T, eastbound and westbound <br />flyover, or Sunfish Lake Blvd overpass with RI/RO) <br />Grade separation treatment at Ramsey Blvd (westbound flyover, High T, eastbound and westbound flyover, <br />Ramsey Blvd overpass with RI/RO) <br />Full grade separation conversion at Thurston Ave (if not completed previously) <br />Purchase right-of-way along north side of TH 10 between Armstrong Blvd and Ramsey Blvd <br />Veterans Dr extension to Ramsey Blvd <br />RR Underpass - Sunfish Lake Boulevard <br />RR Underpass - Ramsey Boulevard <br />156th St extension Jarvis St to Alpine St <br />South Frontage Rd extension Edison St to Adams St <br />RCUT at Alpine Dr with turn lane improvements and South Frontage Rd to Alpine Dr <br />RCUT at Bowers Dr with turn lane improvements <br />a° <br />0 <br />6 <br />m <br />C Q <br />h <br />h <br />m <br />m <br />h <br />h <br />.1 <br />.1 <br />.a <br />i'.h <br />2 <br />a4e!p0 0 <br />0004-p!w <br />uanup R4a4es <br />/ 4uawdoIanap <br />/ Auun4.oddo <br />1.0 <br />HIGHWAY 10 ACCESS PLANNING STUDY <br />