After the infrastructure is in place, the next phase of development would include the <br />construction of a few new facilities, such as three picnic shelters, one to two restroom <br />buildings, a gatehouse, additional trails, a play structure, utilities, lighting and site <br />furnishings as well as some additional natural resource restoration. <br />Phase 3 Development at Mississippi West Regional Park <br />Phase 3: Park Facility Development Estimate <br />Item <br />Total Cost <br />(2010) <br />Design - Architectural & Engineering Services <br />$ 120,000 <br />Picnic Shelters (3) <br />$ 600,000 <br />Restroom Building (2) <br />$ 200,000 <br />Entrance Gate/POC station <br />$ 100,000 <br />Connector Trails <br />$ 150,000 <br />Play Structure <br />$ 100,000 <br />Utilities <br />$ 50,000 <br />Natural Resource Restoration <br />$ 25,000 <br />Lighting, Signage and Site Furnishings <br />$ 25,000 <br />Geotechnical Survey/Wetland Delineation and Assessment <br />$ 25,000 <br />Survey/Construction Staking <br />$ 25,000 <br />Permits (City, Watershed, DNR, COE, NPS) <br />$ 10,000 <br />Subtotal <br />$ 1,430,000 <br />Fees and Contingency <br />$ 140,000 <br />Total <br />$ 1,570,000 <br />Page 15 of 22 <br />