My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 02/11/2016
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2016
>
Agenda - Parks and Recreation Commission - 02/11/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:49:21 PM
Creation date
4/4/2016 3:58:19 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
02/11/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
332
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The final phase of development would include a pedestrian overpass for Trunk Highway 10 <br />that would connect the park with Ramsey Town Center. Estimated costs for the overpass <br />would mostly likely shared between the MN Department of Transportation, Anoka County <br />and the City of Ramsey. <br />1 <br />TRIFI <br />I I <br />TIWA <br />Ram sey <br />Town <br />Center <br />edestrian <br />verpass <br />Proposed Mississippi <br />River Regional Trail ' <br />_— Mississippi River <br />Foster <br />Island <br />Legend <br />Pxisting City Trail <br />Proposed Cit Trail <br />Pxisting Regional Trail <br />VOW, Proposed Regional Trail <br />Regional Park <br />City Park <br />Ramsey Town Center <br />Lake <br />Northstar Comrruter Rail <br />Parcels <br />Cloquet <br />Island <br />000 2500 <br />8,000 <br />Phase 5 Development at Mississippi West Regional Park <br />Phase 5: Pedestrian Connection Estimate <br />Item <br />Total Cost <br />(2010) <br />Design & Engineering Services <br />$ 200,000 <br />Pedestrian Bridge <br />$ 2,000,000 <br />Lighting, Signage & Site Furnishings <br />$ 75,000 <br />Survey/Construction Staking <br />$ 50,000 <br />Geotechnical Survey/Wetland Delineation and Assessment <br />$ 50,000 <br />Permits (City, Watershed, DNR, COE, NPS) <br />$ 10,000 <br />Subtotal <br />$ 2,385,000 <br />Fees and Contingency <br />$ 200,000 <br />Total <br />$ 2,585,000 <br />Page 17 of 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.