Laserfiche WebLink
TABLE OF CONTENTS <br />TITLE SHEET <br />LETTER OF TRANSMITTAL <br />CERTIFICATION SHEET <br />TABLE OF CONTENTS <br />1. EXECUTIVE SUMMARY 1 <br />2. INTRODUCTION 2 <br />2.1 Authorization 2 <br />2.2 Project Overview 2 <br />2.3 Scope 2 <br />3. EXISTING CONDITIONS 3 <br />3.1 Storm Sewer / Drainage Systems 3 <br />3.2 Watermain 3 <br />3.3 Sanitary Sewer 3 <br />3.4 Streets 3 <br />3.5 Land Use 3 <br />4. PROPOSED IMPROVEMENTS 4 <br />4.1 Storm Sewer System Improvements 4 <br />4.2 Watermain Improvements 4 <br />4.3 Sanitary Sewer Improvements 4 <br />4.4 Street Improvements 4 <br />4.5 Private Utilities 4 <br />4.6 Permits 5 <br />4.7 Right-of-Ways/Easements 5 <br />5. FINANCING 6 <br />5.1 Opinion of Cost 6 <br />5.2 Funding 6 <br />5.2.1 Stormwater Utility Funds 6 <br />5.2.2 Special Assessments 6 <br />6. PROJECT SCHEDULE 7 <br />7. CONCLUSIONS AND RECOMMENDATIONS 8 <br />Feasibility Report <br />Business Park 95 Regional Stonnwater Pond Outlet Improvements <br />City of Ramsey Project No. 16-36 <br />