My WebLink
|
Help
|
About
|
Sign Out
Home
07/12/89
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Airport Commission
>
Minutes
>
1989
>
07/12/89
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2025 1:23:03 PM
Creation date
5/24/2004 12:28:02 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Minutes
Document Title
Airport Commission
Document Date
07/12/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
indicating that the expense of winter-time maintenance at the Airport is forcing him to make <br />a decision regarding whether to continue airport operations, close the airport in the winter, <br />or close the airport totally. <br /> <br />Chairman Ippel noted that the Metropolitan Airport Commission is preparing a study of <br />costs to operate both airport facilities at Gateway and South St. Paul. If MAC determines <br />that Gateway serves as a reliever airport, then the costs of services at Gateway should not <br />be borne by Ramsey alone. <br /> <br />COMMISSION INPUT <br /> <br />Chairman Ippel stated that FAA has committed dollars for air traffic control classes at <br />Flying Cloud Airport. However, Flying Cloud is a temporary location and FAA wants to <br />build an entire air traffic control complex. If that complex is to be in Ramsey, there has to <br />be a commitment to upgrade Gateway and pave the runway. <br /> <br />ADJOURNMENT <br /> <br />The consensus was to adjourn at 8:45 p.m. <br /> <br />Respectfully submitted, <br /> <br />Sylvia Frolik <br />Secretary <br /> <br />Airport Commission/July 12, 1989 <br /> Page 2 of 2 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.