Laserfiche WebLink
Building Inspections <br />Please rate your satisfaction regarding <br />the length of time between when you <br />applied for a permit to the time your permit <br />was issued. <br />Very Satisfied <br />Satisfied <br />Neutral <br />Dissatisfied <br />Very <br />Dissatisfied <br />Answer Choices <br />Very Satisfied <br />Satisfied <br />Neutral <br />Dissatisfied <br />Very Dissatisfied <br />Total <br />Answered: 108 Skipped: 2 <br />0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100% <br />Responses <br />40.74% 44 <br />37.96% 41 <br />13.89% 15 <br />7.41% 8 <br />0.00% 0 <br />108 <br /># Comment. Attach additional sheets if necessary. Date <br />1 Septic pumping permit do not contain a time limit to obtain the permits, but the system works very well and the 4/5/2016 9:20 PM <br />2 <br />employee are very educated on the subject and very easy to work with. I very highly rate that service. <br />Applied for permit; was told I needed to re -do my septic system before permit could be issued. Ultimately, it was <br />decided by the City I didn't need the septic system re -done, but jumping through hoops delayed start of project over a <br />month. <br />4/5/2016 8:59 AM <br />4/19 <br />