My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/12/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 04/12/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:48:36 PM
Creation date
4/22/2016 9:23:26 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/12/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
682
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. CONCLUSIONS AND RECOMMENDATIONS <br />This feasibility report explores proposed mill and overlay improvements to approximately <br />18,752 square yards of Sunwood Drive between Sunfish Lake Boulevard and the bridge east of <br />147th Lane and west of Krypton Street in the south-central area of the City of Ramsey. <br />This segment of Sunwood Drive is proposed to receive 2 inch bituminous mill and overlay <br />improvements, and associated appurtenant improvements as necessary and as outlined in this <br />report. <br />It is the recommendation of City staff that the improvements proposed with Division B of City <br />Improvement Project No. 16-00 are feasible, necessary, and cost-effective from an engineering <br />standpoint. Staff also recommends completing the proposed improvements as proposed within <br />this report and not in connection with other proposed improvements. <br />Feasibility Report <br />2016 Street Maintenance Program, Division B: Overlay Improvements <br />City of Ramsey Project No. 16-00 <br />Page 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.