My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/12/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 04/12/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:48:36 PM
Creation date
4/22/2016 9:23:26 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/12/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
682
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF RAMSEY LAND USE APPLICATION <br />TECHNICAL REVIEW FILE <br />DATE <br />APRIL 5, <br />2016 <br />PROJECT ADDRESS <br />EAST OF VARIOLITE STREET <br />SOUTH OF 161 ST AVENUE <br />WOODLANDS 2ND ADDITION <br />PROJECT. TITLE <br />EscRow # <br />115108 <br />DEPARTMENT: <br />Engineering <br />TECHNICAL <br />REVIEWER• <br />Name: Leonard Linton <br />Phone: 763 433-9834 <br />Email: llinton@ci.ramsey.mn.us <br />We have the following comments on the contract proposal submitted to establish the required <br />escrow for the Final Plat of The Woodlands 2nd Addition. <br />The proposal is missing some key elements. They are: <br />1. Mobilization pay item missing. <br />2. A line item for cut/ fill to bring the subgrade to the base of the pavement section. There is <br />an item for subgrade preparation. MNDOT defines subgrade preparation as scarifying and <br />re -compacting the upper 6 inches of subgrade. It does not include cutting/ filling <br />operations. <br />3. A quantity for the pond outlet pipes that were to be installed with the grading package for <br />the entire plat. A quantity for these pipes was not included in the first phase estimate. <br />4. The proposal lists quantities for removal and replacement of concrete curb and gutter and <br />sidewalk. The plans did not identify areas of curb or sidewalk to be replaced. <br />5. Check 6 foot concrete sidewalk quantity, it appears to be about 2,000 sf light. <br />6. Missing pay item for watermain lowering. <br />Please revise the proposal to address these items and resubmit. <br />
The URL can be used to link to this page
Your browser does not support the video tag.