My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 04/26/2016
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2016
>
Agenda - Council Work Session - 04/26/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:49:20 PM
Creation date
4/22/2016 9:29:27 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
04/26/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
295
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Program <br />City of Ramsey, Minnesota <br />Project # 15-STR-002 <br />Project Name Andrie Street/164th Lane Reconstruction <br />2016 thru 2020 <br />Type Improvement Department Street Improvements <br />Useful Life 60 Years Contact <br />Category Street Improvement Priority 6-Planned <br />Description <br />Status Active <br />Total Project Cost: $2,325,000 <br />Includes reconstruction of Andrie Street and 164th Lane between Alpine Drive and Jarvis Street, including a 6 foot on -road bike lane. <br />Total Project Cost = $2,750,000 <br />Street Improvement: $2,325,000 <br />Storm Improvement: $425,000 <br />68 properties eligible for special assessments <br />Justification <br />These streets are in poor condition and require reconstruction. The pavement has deteriorated beyond the point where an overlay could be <br />applied. This project will install concrete curb and gutter and an on -street bike lane. Storm sewer will be added where necessary to protect the <br />pavement. The current roadway has standing water during certain seasons which weakens the pavement. <br />25% Assessment <br />Expenditures 2016 2017 2018 2019 2020 Total <br />Improvements Other than 2,325,000 2,325,000 <br />Building Cost <br />Total 2,325,000 2,325,000 <br />Funding Sources 2016 2017 2018 2019 2020 Total <br />GO Bonding (Road Funding) 1,743,750 1,743,750 <br />Special Assessment - Bonded 581,250 581,250 <br />Total 2,325,000 2,325,000 <br />158 <br />
The URL can be used to link to this page
Your browser does not support the video tag.