Laserfiche WebLink
Ramsey Town Center 6th Addition <br />Construction Plans - DR Horton, Phase 2 Final Plat <br />May 31, 2005 July 6, 2005 <br />Page 2 of 2 <br />tangents. Provide vertical curve at Peridot Terrace 3+25. <br />35 STMH 14 must be a water quality treatment manhole. Storm Sewer grade <br />calculations must make allowance for drop in invert at water quality <br />treatment manholes. Distance varies with specific model chosen. Shop <br />drawings for water quality treatment manholes must be submitted. <br />36 Profiles must be revised as noted on sheet 35. <br />The city requests that the stormwater model for Ramsey Town Center be submitted in EPA SWMM 5.0 <br />format to aid staff in evaluating proposed developments. <br />Please submit updated plans that reflect the changes noted above. <br />• ( eb) <br />‘‘ <br />IP'1%9119cmj <br />P:\Plan Review\RTC 6th Add\07-06-05 Construction Plan Sheet Specific Comments.doc <br />