Laserfiche WebLink
2015 RAIN GARDEN <br />PRELIMINARY COST ESTIMATE <br />CITY OF RAMSEY <br />R16.111171 <br />12/30/2015 <br />ITEM <br />NO. <br />ITEM DESCRIPTION <br />UNIT <br />TOTAL <br />QUANTITY <br />UNIT <br />COST <br />TOTAL <br />COST <br />1 MOBILIZATION LUMP SUM 1 $500.00 $500.00 <br />2 REMOVE CONCRETE CURB AND GUTTER LIN FT 8 $30.00 $240.00 <br />3 REMOVE AND REPLACE BITUMINOUS PAVEMENT SQ FT 16 $50.00 $800.00 <br />4 COMMON EXCAVATION (EV) CU YD 12.5 $30.00 $375.00 <br />5 CONSTRUCT 6" CONCRETE INLET EACH 1 $750.00 $750.00 <br />6 CONSTRUCT 6" CONCRETE OUTLET EACH 1 $400.00 $400.00 <br />7 TRAFFIC CONTROL LUMP SUM 1 $300.00 $300.00 <br />8 INLET PROTECTION EACH 1 $100.00 $100.00 <br />9 ENKAMAT (7010) SQ FT 30 $15.00 $450.00 <br />10 SHREDDED WOOD MULCH MNDOT TYPE 6 CU YD 4 $50.00 $200.00 <br />ESTIMATED CONSTRUCTION COST: $4,115.00 <br />