My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Public Works Committee - 04/19/2016
Ramsey
>
Public
>
Agendas
>
Public Works Committee
>
2010 - 2019
>
2016
>
Agenda - Public Works Committee - 04/19/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/14/2025 10:48:26 AM
Creation date
5/11/2016 10:33:50 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Public Works Committee
Document Date
04/19/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Committee 6. 1. <br />Meeting Date: 04/19/2016 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Title: <br />Staff Updates on Improvement Projects and Items of Interest <br />Purpose/Background: <br />The purpose of this case is to update the Public Works Committee on active and proposed improvement projects <br />within the City, and on other items of interest to the Committee. <br />MnDOT Improvement Projects <br />• TH 47 at 142nd Avenue <br />• MnDOT updated Council on proposed safety improvement project during April 12th Work Session <br />• Project proposes to remove left turns from southbound TH 47 to eastbound 142nd Avenue <br />• Construction proposed to occur this fall <br />Anoka County Improvement Projects <br />• US 10 & CR 83/Armstrong Boulevard Interchange <br />• Traffic signals are operational and are on all -way flashing red until all lanes are ready to be opened to <br />traffic <br />• The NW on -ramp to westbound Highway 10 is closed until April 22nd <br />• The Llama Street access to Highway 10 is permanently closed to traffic <br />• Westbound median crossover at Traprock Street will soon be removed (TBD) <br />• Highway 10 speed limit restrictions will remain in place until project completion <br />• Project completion scheduled for late May <br />• CR 83/Armstrong Boulevard Pavement Reclamation and Overlay — 150th Lane to 173rd Avenue <br />• Pavement to be reclaimed and overlaid with 4" new pavement <br />• Bypass lanes added at 154th, 157th, and 163rd Avenues <br />• Right turn lanes added at 155th and Tiger Avenues <br />• Work will not interfere with Game Fair event <br />• Project schedule TBD <br />• CR 116/Bunker Lake Boulevard Pavement Reclamation and Overlay — Ramsey Boulevard to Basalt <br />Street <br />• Pavement to be reclaimed and overlaid with 4" new pavement <br />• Considering striping improvements to allow left turns onto Azurite Street from westbound CR 116 <br />• Project schedule TBD <br />City Improvement Projects <br />• Business Park 95 Regional Stormwater Pond Improvements <br />• Surveying site <br />• Reviewing options for cost savings by minimizing impacts to existing streets <br />• Plans will be complete this spring <br />• Summer / fall construction (during dry season) <br />• Andrie Street & 164th Lane Reconstruction <br />• Latest project update letters mailed to residents March 30, 2016 (attached) <br />• Plans and specifications have been approved by State Aid and City Council <br />• Plans and specifications have been advertised for bids <br />• May 24th - Council to consider accepting bids & awarding construction contract <br />• Construction proposed to begin early June 2016 <br />
The URL can be used to link to this page
Your browser does not support the video tag.