Laserfiche WebLink
City of Ramsey, Minnesota <br />Capital Improvement Program <br />2016 thru 2020 <br />PROJECTS BY YEAR & PRIORITY <br />Project Name Category <br />2016 1 <br />Priority I -Existing Obligation (High) <br />800 MHZ Radio Replacements <br />Replace Rescue Truck #21 Box <br />2016 Chev Tahoe to Replace 2012 Chev Tahoe #364 <br />800 MHZ Radio Replacement <br />2016 Chevy Impala to Replace 2006 Chev Impala #364 <br />2016 Chevy Traverse Replace 2006 Chev Impala #365 <br />Replace-1984 Elgin Sweeper: Unit#612 <br />Replace 2003 1 -Ton Truck 4x4: Unit #640 <br />New Snowplow Truck: Single Axle with Plow <br />800 MHZ Radio Replacement <br />Mississippi River Trail -West End <br />Reconstruction of Andrie Street/164th Avenue <br />Pond Outlet for Business Park 95 <br />Andrie Street/164th Lane Reconstruction <br />2016 Overlay Projects <br />Sunwood Drive Striping Improvments <br />Emergency Power Supply for Well #3 <br />Priority 2-New Addition (High) <br />Elmcrest Park & The Draw Park Entrance & Signage <br />Drinking Fountains/Misting Station <br />Parkway for Central Park <br />The Draw Grates <br />Irrigation Filter System for The Draw <br />Identity COR Infiltration Banking Area <br />Riverdale Drive Extension: Traprock to Ramsey Blvd <br />Priority 5-Opportunity (Unfunded) <br />McKinley Trail Connection to Anoka <br />Sewer Forcemain Manhole Replacement <br />2017 <br />Priority I Existing Obligation (High) <br />Replace File Server <br />800 MHZ Radio Replacements <br />Replace Duty Officer Truck <br />Replace Fire Chief Vehicle <br />Eqpt Replacement <br />Eqpt Replacement <br />Eqpt Replacement <br />Eqpt Replacement <br />Eqpt Replacement <br />Eqpt Replacement <br />Eqpt Replacement <br />Eqpt Replacement <br />Eqpt Replacement <br />Eqpt Replacement <br />Park Improvements <br />Stormwater Utility <br />Stormwater Utility <br />Street Improvements <br />Street Improvements <br />Street Improvements <br />Water Utility <br />Park Improvements <br />Park Improvements <br />Park Improvements <br />Park Improvements <br />Park Improvements <br />Stormwater Utility <br />Street Improvements <br />Park Improvements <br />Sewer Utility <br />Total for 2016 <br />Eqpt Replacement <br />Eqpt Replacement <br />Eqpt Replacement <br />Eqpt Replacement <br />Project # Priority <br />FIRE-551 1 <br />FIRE-559 1 <br />POL-321 1 <br />POL-355 1 <br />POL-364 1 <br />POL-365 1 <br />PW-612 1 <br />PW-640 1 <br />PW-656 1 <br />PW-659 1 <br />08-PARK-002 1 <br />15-STM-002 1 <br />16-STM-001 1 <br />15-STR-002 1 <br />15-STR-009 1 <br />16-STR-005 1 <br />16-WTR-001 1 <br />04-PARK-003 <br />06-PARK-002 <br />06-PARK-008 <br />12-PARK-006 <br />16-PARK-001 <br />16-STM-002 <br />15-STR-001 <br />12-PARK-008 <br />16-SEW-001 <br />15-IT-001 <br />FIRE-551 <br />FIRE-567 <br />FIRE-569 <br />Total for: Priority 1 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />Total for: Priority 2 <br />5 <br />5 <br />Total for: Priority 5 <br />Project Cost <br />56,900 <br />50,000 <br />34,000 <br />51,906 <br />28,000 <br />30,000 <br />192,000 <br />61,000 <br />186,000 <br />6,800 <br />1,519,200 <br />527,000 <br />332,500 <br />2,378,000 <br />300,000 <br />30,000 <br />115,000 <br />5,898,306 <br />80,000 <br />7,000 <br />350,000 <br />10,000 <br />25,000 <br />320,000 <br />1,000,000 <br />1,792,000 <br />50,000 <br />30,000 <br />80,000 <br />7,770,306 <br />7,500 <br />56,900 <br />40,000 <br />50,000 <br />15 <br />