My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council Work Session - 05/24/2016
Ramsey
>
Public
>
Agendas
>
Council Work Session
>
2016
>
Agenda - Council Work Session - 05/24/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:50:01 PM
Creation date
5/25/2016 8:33:09 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council Work Session
Document Date
05/24/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
237
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project Name <br />Whispering Pines Estates Plat 2 Storm Sewer <br />North Highway 10 Frontage Road <br />Ramsey Blvd RR Underpass & Hwy 10 Interchange <br />North Hwy 10 Frontage Road -Ramsey to SLB <br />2020 <br />Priority 3-Existing Obligation (Med) <br />Discovery Recovery Server <br />2020 Chev Caprice - Replace2017 Chev Caprice #371 <br />2020 Chev Tahoe Replace 2016 Chev Tahoe #361 <br />Replace EngrCar#407 With Chevy Impala <br />Replace 2002 3/4 Ton Truck 4x4: Unit #637 <br />Replace Sidewalk Machine: Unit #655 <br />Replace 2006 Tandem Axle Plow Truck Unit #668 <br />Replace 2013 Toro Wide Area Mower. Unit #679 <br />Reconstruct Riverdale Drive to Tungston Street <br />Priority 4-New Addition (Med) <br />New 1-Ton Pickup With Box & Plow Equipment <br />Watermain Sunfish Lk Blvd <br />Priority 5-Opportunity (Unfunded) <br />Abandon Liftstation Wildlife Sanctuary <br />Abandon Lift Station River Pines <br />Alpaca Estates Outlot <br />North Hwy 10 Frontage Road -Ramsey to SLB <br />South Hwy 10 Frontage Rd-SLB to Anoka <br />River Pines Lift Station Water Connection <br />Construct Well and Pumphouse #9 <br />GRAND TOTAL <br />Category <br />Stormwater Utility <br />Street Improvements <br />Street Improvements <br />Street Improvements <br />Total for 2019 <br />Eqpt Replacement <br />Eqpt Replacement <br />Eqpt Replacement <br />Eqpt Replacement <br />Eqpt Replacement <br />Eqpt Replacement <br />Eqpt Replacement <br />Eqpt Replacement <br />Street Improvements <br />Eqpt Replacement <br />Water Utility <br />Sewer Utility <br />Sewer Utility <br />Site Acquisitions <br />Street Improvements <br />Street Improvements <br />Water Utility <br />Water Utility <br />Total for 2020 <br />Project # Priority <br />11-STM-003 5 <br />04-STR-007 5 <br />16-STR-002 5 <br />16-STR-003 5 <br />15-IT-002 <br />POL-371 <br />POL-372 <br />PW-407 <br />PW-637 <br />PW-655 <br />PW-668 <br />PW-697 <br />12-STR-008 <br />PW-703 <br />12-WTR-001 <br />04-SEW-001 <br />08-SEW-004 <br />08-ACQ-002 <br />16-STR-003 <br />16-STR-004 <br />08-WTR-003 <br />16-WTR-002 <br />Total for: Priority 5 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />3 <br />Total for: Priority 3 <br />4 <br />4 <br />Total for: Priority 4 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />5 <br />Total for: Priority 5 <br />Project Cost <br />330,000 <br />3,400,000 <br />18,700,000 <br />7,000,000 <br />49,651,300 <br />52,019,700 <br />11,000 <br />29,000 <br />34,000 <br />28,000 <br />45,000 <br />99,000 <br />225,000 <br />95,000 <br />1,350,000 <br />1,916,000 <br />50,000 <br />450,000 <br />500,000 <br />352,000 <br />45,000 <br />35,000 <br />5,900,000 <br />2,000,000 <br />20,000 <br />1,500,000 <br />9,852,000 <br />12,268,000 <br />121,060,542 <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.