My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/24/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 05/24/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:49:53 PM
Creation date
5/25/2016 9:11:13 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/24/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
610
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Program <br />City of Ramsey, Minnesota <br />Project # <br />16-STM-001 <br />Project Name Pond Outlet for Business Park 95 <br />2016 thrtu 2020 <br />Type Improvement Department Stormwater Utility <br />Useful Life 20 Years Contact <br />Category Storm Water Utility Improveme Priority 1-Existing Obligation (High) <br />Description <br />Status Active <br />Total Project Cost: $332,500 <br />This project will provide an outlet for an existing pond in Business Park 95. The City developed this plat in 1995. A natural low area was left for <br />stormwater ponding. A neighboring property proposed adding on to their building. During the plan review process it was determined that the <br />ponding area was not large enough. <br />Justification <br />The City developed the project. The ponding area did not have an outlet and the City stated that an outlet would be developed in the future. The <br />ponding area was intended to serve all of the plat. The recent building expansion highlighted the need for expanded storage and an outlet from <br />the pond. The lack of an outlet means the pond has to be oversized to hold 2 100-year storms. The City completed an outlet to the Mississippi <br />River from the eastern side of this plat with the Sunfish Lake Blvd expansion project. This project will extend storm sewer from this existing <br />pond to the existing storm sewer, providing an outlet from the pond. <br />Expenditures 2016 2017 2018 2019 2020 Total <br />Improvements Other than 332500 332,500 <br />Building Cost <br />Total 332,500 332,500 <br />Funding Sources 2016 2017 2018 2019 2020 Total <br />Storm Water Management 110,833 110,833 <br />Fund <br />Storm Water Utility Fund 221,667 221,667 <br />Total 332,500 332,500 <br />130 <br />
The URL can be used to link to this page
Your browser does not support the video tag.