My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/24/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 05/24/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:49:53 PM
Creation date
5/25/2016 9:11:13 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/24/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
610
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Program <br />City of Ramsey, Minnesota <br />Project # <br />12-STR-008 <br />2016 thrtu 2020 <br />Project Name Reconstruct Riverdale Drive to Tungston Street <br />Type Improvement Department Street Improvements <br />Useful Life 60 Years Contact <br />Category Street Improvement Priority 3-Existing Obligation (Med) <br />Description <br />Status Active <br />Total Project Cost: $1,350,000 <br />This project would reconstruct Riverdale Drive to Tungston Street <br />Justification <br />471 <br />This project will reconstruct Riverdale Drive, grading the shoulder for a 10 foot bituminous trail which is part of the Mississippi River Trail grant <br />from the National Park Service. This project as scoped removes all bituminous and curb. Storm sewer will be installed to meet MSA spacing <br />guidelines. The curb will be replaced and new bituminous will be installed. This is an MSA route. <br />The roadway is scoped at two 12 foot driving lanes and two eight foot parking lanes. There could be cost savings through retaining the curb on <br />one side of the road, installed one 8 foot parking lane and replacing curb. <br />Expenditures <br />Improvements Other than <br />Building Cost <br />Total <br />2016 2017 2018 2019 2020 Total <br />1,350,000 1,350,000 <br />1,350,000 1,350,000 <br />Funding Sources 2016 2017 2018 2019 2020 Total <br />Public Improvement Revolving 1,350,000 1,350,000 <br />Fund <br />Total <br />1,350,000 1,350,000 <br />140 <br />
The URL can be used to link to this page
Your browser does not support the video tag.