My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/24/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 05/24/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:49:53 PM
Creation date
5/25/2016 9:11:13 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/24/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
610
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Program <br />City of Ramsey, Minnesota <br />Project # <br />Project Name <br />16-WTR-002 <br />Construct Well and Pumphouse #9 <br />2016 thru 2020 <br />Type Improvement Department Water Utility <br />Useful Life 50 Years Contact <br />Category Water Utility Improvement Priority 5-Opportunity (Unfunded) <br />Description <br />Status Active <br />Total Project Cost: $1,500,000 <br />Construct new municipal groundwater supply well with supporting pumphouse and chemical feed system to remove pollutants, including iron and <br />manganese, and to add chlorine and fluoride. <br />Justification <br />This project will provide a ninth municipal groundwater well with pumphouse and chemical feed system to treat the groundwater before supplying <br />for public consumption. This project was added in lieu of the previously proposed surface water supply treatment facility which was removed due <br />to excessively large project costs and a general lack of regional support for funding the proposed surfacewater treatment facility. As the City of <br />Ramsey continues to grow, additional wells or a surface water supply facility will ne needed. <br />Expenditures 2016 2017 2018 2019 2020 Total <br />Improvements Other than 1,500,000 1,500,000 <br />Building Cost <br />Total 1,500,000 1,500,000 <br />Funding Sources 2016 2017 2018 2019 2020 Total <br />Water Utility Fund 1,500,000 1,500,000 <br />Total 1,500,000 1,500,000 <br />170 <br />
The URL can be used to link to this page
Your browser does not support the video tag.