My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/24/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 05/24/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:49:53 PM
Creation date
5/25/2016 9:11:13 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/24/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
610
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CC Regular Session 7. 8. <br />Meeting Date: 05/24/2016 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Information <br />Title <br />Adopt Resolution #16-05-098 Authorizing Master Partnership Contract Work Order for Improvement Project <br />#15-23, TH 47 Pedestrian Crosswalk Improvements <br />Purpose/Background: <br />Purpose: <br />The purpose of this case it to adopt Resolution # 16-05-098 authorizing the City Engineer to enter into a Work <br />Order in accordance with Master Partnership Contract # 1001234 for the construction of Improvement Project <br />#15-23, TH 47 Pedestrian Crosswalk Improvements. <br />Background: <br />In the spring of 2015, construction of a multi -use pedestrian trail was completed on the north side of Nowthen <br />Boulevard/CR 5 with the Stoney River Assisted Living facility in the northwest corner of the intersection of TH 47 <br />and CSAH 5. While the trail was under construction, City Staff began planning and design efforts for a new <br />pedestrian crosswalk on TH 47 to connect the new trail segment to the existing trail east of TH 47. Since TH 47 is a <br />State highway, Staff needed to work with MnDOT to discuss their design and right-of-way use requirements. <br />Staff from the City and MnDOT met on July 16th, 2015. During the meeting it was discussed that significant cost <br />savings could occur if the City executed a Master Partnership Contract with MnDOT. Master Partnership Contracts <br />allow local government agencies and MnDOT to work together closely to coordinate the efficient delivery of <br />transportation services within MnDOT right-of-ways by performing work for each other, and by sharing facilities, <br />equipment, staff, data, and miscellaneous other services. As such, the City executed a Master Partnership Contract <br />with MnDOT in October of 2015 (see attached Agreement # 1001234). This prevents the City from needing to use <br />the traditional design, bid, build process to construct the proposed TH 47 pedestrian crosswalk improvements, <br />which will save the City thousands of dollars in plan preparation fees, and months of time typically spent on <br />MnDOT plan reviews and approvals and on the bidding process. <br />It was also discussed at the July 16th meeting that the City would need to execute an updated Limited Use Permit <br />(LUP) encompassing all sections of the existing trail system east of TH 47 within MnDOT's right-of-way, as well <br />as the proposed TH 47 pedestrian crosswalk, and that the LUP would need to be executed prior to beginning <br />construction of the crosswalk. The purpose of the LUP is to allow the City to construct, operate and maintain trail <br />facilities within MnDOT's right-of-way. Attached is LUP # 0206-0028 which was approved for execution by the <br />City Council on May 10th. <br />Since Master Partnership Contract #10001234 and Limited Use Permit #0206-0028 are now in place, City Staff is <br />requesting Council authorization to enter into a Work Order to construct the proposed TH 47 Pedestrian Crosswalk <br />Improvements. Staff estimates project costs will total $19,500, though costs are still being finalized This includes <br />an estimated $4,500 for MnDOT to complete signal system improvements including installation of wiring and <br />adding two push button pedestals and two count -down signal heads, and $15,000 for City crews and contractors to <br />complete the remaining improvements which includes $1,600 to remove and replace 75' of concrete curb and <br />gutter, $600 for median nose modifications, $1,000 for bituminous pavement removals and repairs, $3,000 to install <br />two new pedestrian curb ramps, $5,500 for pavement striping, and $2,400 for traffic control, as well as other <br />miscellaneous costs. <br />
The URL can be used to link to this page
Your browser does not support the video tag.