My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/24/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 05/24/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:49:53 PM
Creation date
5/25/2016 9:11:13 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/24/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
610
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Observations/Alternatives: <br />Observations: <br />The attached Feasibility Report explored construction of a storm sewer outlet pipe under the outside pavement edge <br />along both Unity and McKinley Streets. This required significant pavement repairs and storm sewer improvements <br />resulting in an estimated total project cost of $332,368. The attached final plans provide a pond outlet that is routed <br />through existing drainage and utility easements in green spaces between several properties requiring fewer storm <br />sewer improvements, along with some ditch improvements, resulting in a total estimated project cost of $221,675. <br />This revised design provides a project cost savings of over $100,000. <br />Ultimately, the Feasibility Report design concept and the design in the final plans direct runoff from the pond outlet <br />to the same existing regional stormwater ponds south of the BNSF railway, which then ultimately outlets to the <br />Mississippi River as shown in Figure 1 (attached). <br />The storm sewer improvements proposed to be constructed between the properties at 6250 and 6390 McKinley <br />Street is located between a parking lot and a drive aisle, both of which have paved surfaces with curb and gutter. <br />Construction will therefore need to be completed using utility boxes to minimize disturbance to private <br />infrastructure. Upon Council approval of plans and authorization to advertise for bids, staff will meet with the two <br />property owners to discuss this project and coordinate schedules. Information from this meeting will then be shared <br />with Council when bids are presented for approval of a construction contract on June 28th. <br />Alternatives: <br />Alternative Action #1 — Motion adopting Resolution #16-05-087 approving plans and specifications and authorizing <br />bids for Improvement Project #16-36, Business Park 95 Regional Stormwater Pond Improvements. <br />Alternative Action #2 — Motion denying adoption of Resolution #16-05-087 at this time. <br />Funding Source: <br />Plans and Specifications were completed in-house as part of staff's regular duties. No outside expenses were <br />incurred. <br />The engineer's opinion of probable project costs based on the attached plans is $221,675. This cost includes 23% <br />indirect costs for administrative (6%), engineering (15%), finance (1%), and legal (1%) fees. <br />The improvements are proposed to be funded utilizing a combination of one-third Stormwater Management Funds <br />and two-thirds Stormwater Utility Funds. This split was arrived at following a discussion between Staff and the <br />Public Works Committee on February 16th when the Committee asked for clarification on how the City applies <br />both Stormwater Management and Stormwater Utility Funds to projects, noting concerns that these funds are <br />heavily targeted as funding sources for future projects listed in the CIP. The draft Feasibility Report as reviewed by <br />the Committee recommended the improvements be funded solely from the Stormwater Utility Fund. The Feasibility <br />Report was subsequently revised to recommend the improvements be funded using a combination of one-third <br />Stormwater Management Funds and two-thirds Stormwater Utility Funds. <br />Special assessments are not proposed since the City intended to construct the pond improvements during <br />development of the business park, which never occurred. <br />Recommendation: <br />Staff recommends approval of Alternative Action #1, thereby allowing the proposed pond improvements to be <br />constructed in 2016 in accordance with the LRRWMO Permit for the Dedicated Networks expansion project, which <br />was approved contingent on the improvements being completed in 2016, and avoiding delays or denials of WMO <br />permits for future business expansion projects within the business park. <br />Action: <br />
The URL can be used to link to this page
Your browser does not support the video tag.