Laserfiche WebLink
WSB <br />SB <br />& ANsoctenes, Inc. <br />Engineering • Planning • Environmental • Construction <br />May 26, 2016 <br />Patrick Brama <br />Assistant City Administrator <br />City of Ramsey <br />7550 Sunwood Drive NW <br />Ramsey, Minnesota 55303 <br />Re: Shovel Ready Certification Ramsey Sites <br />Dear Mr. Brama: <br />701 Xenia Avenue South <br />Suite 300 <br />Minneapolis, MN 55416 <br />Tel: 763-541-4800 <br />Fax: 763-541-1700 <br />We appreciate the opportunity to provide this proposal related to the compiling and completion of the <br />information required for the Shovel Ready Certification for the sites in the City of Ramsey. The following <br />represents our understanding of the scope of work requested. <br />The parcels identified on the attached map as parcel number 37, 42, 45, 46, 47, 48, 50, 51, 52, 53 have <br />been reviewed for the information that is currently available for the shovel ready program. In addition, <br />the future biz park has also been reviewed to determine what additional work would be required for the <br />park to be certified. Upon the review of the existing information the attached spreadsheet was created <br />to identify the outstanding items and the estimated costs associated with completing those items. <br />These estimates are based upon the information that was available and does not include any field work <br />which if authorize will be completed in the next phase of the project. <br />If the information that is currently available through sources is incorrect, the costs of some of the items <br />could increase however based upon the relatively recent completion of the plat for the Ramsey COR it is <br />anticipated that most of the field information is accurate. Based upon the estimated costs for the <br />project 3 sites (47, 51, 52, 53) were removed from the project to reduce the overall cost. These sites are <br />included on the attached spreadsheet for reference purposes. WSB would complete the wok indicated <br />on the attached spreadsheet with the caveats listed above for an amount not to exceed $86,661. <br />WSB will also prepare and submit the require documentation for the shovel ready certification through <br />the Department of Employment and Economic Development's certification program. The fee for each of <br />the parcels that are placed in the program would be $3,500 which would include the certification fee of <br />$3,250 per site. The above estimated fee includes the certification of 6 sites and would be adjusted <br />accordingly should the city decide to increase or decrease the number of sites certified. The has <br />indicated that Connexus Energy will be assisting with the cost of the certification which has also been <br />identified for the projected costs. Should that number change the total cost of the project would be <br />adjusted accordingly. <br />Minneapolis • St. Cloud <br />Equal Opportunity Employer <br />