My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/26/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 04/26/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:49:11 PM
Creation date
6/15/2016 3:07:06 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/26/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
683
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B K V <br />GROUP <br />CHANGE ORDER <br />AIA DOCUMENT G701 <br />Architeciure Interioa DesIn Landscape Architecture Engtneerinb <br />Phone: 612.339,3752 Fax. 6 a 2339.6212 ra•sva:bkvgroup.com <br />Enriching Lives ohd Strengthening Communities <br />Owner: x <br />Architect: X <br />Consultant: <br />Contractor: X <br />Field: <br />Other: <br />THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH <br />RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA <br />DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. <br />PROJECT: CHANGE ORDER NO.: 03-MATERIAL <br />Ramsey Fire Station #2 <br />5650 Alpine Drive NW <br />Ramsey, MN 55303 DATE OF ISSUANCE: 3/4/16 <br />OWNER: <br />City of Ramsey ARCHITECT'S PROJECT #: 1937.01 <br />7550 Sunwood Drive <br />Ramsey, MN 55303 <br />CONTRACT DATE: April 15, 2015 <br />ARCHITECT: <br />Boarman Kroos Vogel Group <br />222 N. 2" Street CONTRACT FOR: General Construction <br />Minneapolis, MN 55401 <br />TO CONTRACTOR: <br />Brennan Construction of MN <br />5985 Brandel Rd NW <br />Mankato, MN 56001 <br />The contract is changed as follows: <br />(Include, where applicable, any undisputed amount attributable to previously executed Construction Change <br />Directives) <br />RFP # Subject Labor <br />1 CR 20 Add L angle to Precast Stone Shops ADD 508 <br />2 CR 22R Exterior Signage Lighting ADD 855 <br />3 CR 23R GFI at Water Cooler ADD 207 <br />4 CR 25 Power to Lockers in Turnout #109 ADD 894 <br />5 CR 26 Eliminate Rappelling Hooks CREDIT (235) <br />6 CR 27 Bent Cover Plates Under Mezzanine ADD 160 <br />7 CR 28 Revised Window Jamb Detail CREDIT <br />8 CR 29 Remove Stainless Steel Shelf in Compressor CREDIT (235) <br />Room <br />CR 30 Tile at Door 117 Jamb ADD 117 <br />TOTALS: ADD $2,271 <br />ADD (0) Days <br />BKV Group, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.