My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/26/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 04/26/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:49:11 PM
Creation date
6/15/2016 3:07:06 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/26/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
683
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BKV <br />GROUF <br />CHANGE ORDER <br />AIA DOCUMENT G701 <br />Architecture htenor Design LAndscape Architecture Engineer rig <br />Phone- 612.339.3752 Fax- 612.339.6212 www.bkvgroup,com <br />Enriching Lives and Strengthening Communitres <br />Owner: X <br />Architect: X <br />Consultant: <br />Contractor: X <br />Field: <br />Other: <br />THIS DOCUMENT HAS IMPORTANT LEGAL CONSEQUENCES; CONSULTATION WITH AN ATTORNEY IS ENCOURAGED WITH <br />RESPECT TO ITS COMPLETION OR MODIFICATION. AUTHENTICATION OF THIS ELECTRONICALLY DRAFTED AIA <br />DOCUMENT MAY BE MADE BY USING AIA DOCUMENT D401. <br />PROJECT: CHANGE ORDER NO.: 02-LABOR <br />Ramsey Fire Station #2 <br />5650 Alpine Drive NW <br />Ramsey, MN 55303 DATE OF ISSUANCE: 2/3/16 <br />OWNER: <br />City of Ramsey ARCHITECT'S PROJECT #: 1937.01 <br />7550 Sunwood Drive <br />Ramsey, MN 55303 <br />CONTRACT DATE: April 15, 2015 <br />ARCHITECT: <br />Boarman Kroos Vogel Group <br />222 N. 2nd Street CONTRACT FOR: General Construction <br />Minneapolis, MN 55401 <br />TO CONTRACTOR: <br />Brennan Construction of MN <br />5985 Brandel Rd NW <br />Mankato, MN 56001 <br />The contract is changed as follows: <br />(Include, where applicable, any undisputed amount attributable to previously executed Construction Change <br />Directives) <br />RFP # Subject Labor <br />1 PR3 Eliminate conduit from hose tower CREDIT $(596) <br />2 PR4 Underground sleeve for fiber ADD $767 <br />3 PR7R Parking lot revisions ADD $4,721 <br />4 PR 8 Door for open Office 121 ADD $965 <br />5 PR 9R Revised water heater SUF100-250NE ADD $6,917 <br />6 PR 10 Hose tower head detail ADD $2,521 <br />7 PR 11 Remove platform at hose tower stair ADD $519 <br />8 PR 12 Schluter trim in lieu of bullnose ADD $523 <br />9 PR 13-R Radio Room ADD $3,342 <br />10 CR 3 Move water main inside building ADD $157 <br />11 CR 5 Continuous Hinge - - <br />12 CR 7 Electrical service design changes (RFI 14 & 15) ADD $950 <br />BKV Group, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.