Laserfiche WebLink
Category <br />Street Light Utility Improvement Total <br />Water Utility Improvement <br />Complete Pump House 3 <br />The COR Bunker Lake Blvd (Armstrong - Ramsey Blvd) <br />Watermain Looping: (Ramsey Blvd to Traprock St) <br />Well Rehabilitation & Pump Replacement <br />River Pines Lift Station Water Connection <br />Fire Station #1 Extension of Water <br />Watermain Sunfish Lk Blvd <br />Refurbish Water Tower #2 <br />Refurbish Water Tower #1 <br />Emergency Power Supply for Well #3 <br />Construct Well and Pumphouse #9 <br />Water Utility Improvement Total <br />GRAND TOTAL <br />Project# <br />2016 2017 2018 2019 2020 Total <br />15,000 290,000 15,000 15,000 15,000 350,000 <br />04-WTR-005 60,000 60,000 <br />04-WTR-009 340,000 340,000 <br />04-WTR-018 185,000 185,000 <br />07-WTR-001 35,000 38,000 41,000 44,000 47,000 205,000 <br />08-WTR-003 20,000 20,000 <br />11-WTR-003 55,000 55,000 <br />12-WTR-001 450,000 450,000 <br />14-WTR-001 1,300,000 1,300,000 <br />14-WTR-002 1,300,000 1,300,000 <br />16-WTR-001 115,000 115,000 <br />16-WTR-002 1,500,000 1,500,000 <br />150,000 1,523,000 1,796,000 44,000 2,017,000 5,530,000 <br />8,495,306 4,897,836 45,598,700 37,083,700 13,215,000 109,290,542 <br />18 <br />