Laserfiche WebLink
BRENNAN COMPANIES <br />h... �.=.a• .: w ^s .j <br />SRINNAN CON$IRUClioN <br />34 Cod wain.. n.a bar 20 feCOi <br />IRINNAN PaOFlu:U r 6314432?W? OS404IRrurn*abltee 011011 <br />MEMORANDUM <br />TO: Bruce Schwartzman <br />CC: Scott Jones <br />FROM: Joe Brennan <br />DATE: 12/16/2015 <br />RE: Ramsey Fire Station #2 - CR 19 <br />Bruce, <br />Below is the breakdown of work scope changes resulting in contract amount modifications. <br />Item 1: Per OAC meeting on 12/14/15, delete wire for Comp #1 and Comp #2, and install <br />wire as required for existing compressor. Conduit to be left for future connections. <br />Item Description Unit Price Quantity Labor Material <br />Subcontractor: <br />Rapid Electric <br />Brennan Construction: <br />Supervision <br />Carpentry <br />Bond <br />Notes: <br />Approved: Date: <br />$70.00 <br />$65.00 <br />1% <br />0 <br />0 <br />Sub Total <br />5% OH&P <br />GC Total <br />10% OH&P <br />TOTAL <br />($298.00) <br />$0.00 <br />$0.00 <br />$0.00 <br />($256.00) <br />$0.00 <br />($298.00) ($256.00) <br />N/A N/A <br />$0.00 $0.00 <br />$0.00 $0.00 <br />($298) ($256) <br />