My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/26/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 04/26/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:49:11 PM
Creation date
6/15/2016 3:07:06 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/26/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
683
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
B K V <br />GROUP <br />PROPOSAL REQUEST <br />AIA DOCUMENT G709 <br />PROJECT: <br />OWNER: <br />ARCHITECT: <br />Architecture Intenor Design Lsndsupe Architecture Engineerng <br />Phone- 612.339.3252 Fax: 612339.6212 www.bkvgroup.com <br />Enriching Lives and Strengthening Communities <br />Ramsey Fire Station #2 <br />5650 Alpine Drive NW <br />Ramsey, MN 55303 <br />City of Ramsey <br />7550 Sunwood Drive <br />Ramsey, MN 55303 <br />Boarman Kroos Vogel Group <br />222 N. 2nd Street <br />Minneapolis, MN 55401 <br />TO CONTRACTOR: Brennan Construction of MN <br />5985 Bandel Rd NW <br />Mankato, MN 56001 <br />Owner: via Submittal Exchange <br />Architect: via Submittal Exchange <br />Consultant: via Submittal Exchange <br />Contractor: via Submittal Exchange <br />Field: via Submittal Exchange <br />Other: via Submittal Exchange <br />PROPOSAL REQUEST NO.: THREE (3) <br />DATE OF ISSUANCE: <br />CONTRACT FOR: <br />CONTRACT DATED: <br />ARCHITECT'S PROJECT <br />NO: <br />August 25, 2015 <br />New Construction <br />April 15, 2015 <br />1937.01 <br />Please submit an itemized proposal for changes in the Contract Sum and Contract Time for proposed <br />modifications to the Contract Documents described herein. Within Fourteen (14) days, the Contractor must <br />submit this proposal or notify the Architect, in writing, of the date on which proposal submission is <br />anticipated. <br />THIS IS NOT A CHANGE ORDER, CONSTRUCTION DIRECTIVE OR A DIRECTION TO PROCEED WITH <br />THE WORK DESCRIBED IN THE PROPOSED MODIFICATIONS. <br />Description: <br />Extra conduit for connection of tower and building noted on E010:Note 5 is not required or needed <br />by city or county. Please provide a credit for the labor and material work shown. <br />Attachments: <br />E010: Electrical Site Plan <br />REQUESTED BY: <br />Dean Kapler, Fire Chief <br />City of Ramsey <br />ISSUED BY: <br />Craig Carter, AIA <br />BKV Group <br />
The URL can be used to link to this page
Your browser does not support the video tag.