Laserfiche WebLink
BRENNAN COMPANIES <br />IRINMAN CONSTRUGTtON <br />IIIINNAN PROPFRTIFS >1SOY .z.Yi9s F o*445410S ieurr4v4Itizanarrnâ–ş <br />MEMORANDUM <br />TO: Bruce Schwartzman <br />CC: Scott Jones <br />FROM: Joe Brennan <br />DATE: 12/16/2015 <br />RE: Ramsey Fire Station #2 - PR 9 REVISED - SUF100-250NE <br />Bruce, <br />Below is the breakdown of work scope changes resulting in contract amount modifications. <br />Item 1: Replace electric water heater with SUF100-250NE. <br />Item Description Unit Price Quantity Labor Material <br />Subcontractor: <br />Summit Companies <br />Greenwald Roofing & Sheet Metal <br />Rapid Electric <br />Brennan Construction: <br />Supervision <br />Carpentry <br />Bond <br />$75.00 <br />$65.00 <br />1% <br />0.0 <br />6.0 <br />Notes: Carpentry to patch existing hole in precast floor where Sub Total <br />drain is currently located, and make two penetrations in the <br />roof. Water heater pad is already poured for two water <br />heaters, cost to be revised if pad needs to be re -worked. <br />Approved: Date: <br />5% OH&P <br />GC Total <br />10% OH&P <br />TOTAL <br />$5,580.00 <br />$400.00 <br />$127.00 <br />$0.00 <br />$390.00 <br />$69.00 <br />$7,549.00 <br />$200.00 <br />$44.00 <br />$83.00 <br />$6,107.00 $7,793.00 <br />$305.35 $389.65 <br />$459.00 $83.00 <br />$45.90 $8.30 <br />$6,917 $8,274 <br />