My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 04/26/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 04/26/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:49:11 PM
Creation date
6/15/2016 3:07:06 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
04/26/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
683
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Observations: <br />Staff has evaluated the capacity of the City of Ramsey's trunk sanitary sewer system downstream of the point of <br />connection and determined there is adequate capacity to serve the two City of Anoka parcels as requested. <br />Staff also reviewed existing drainage and utility easements along the City of Ramsey's trunk sanitary sewer line <br />north of Highway 10 and found that drainage and utility easements do not exist in several locations. Staff is <br />therefore working to resolve this issue. The City of Anoka will be responsible for obtaining required temporary <br />construction easements for the proposed work. <br />The City of Anoka needs to serve their two parcels with sanitary sewer and water utilities before development can <br />occur. The City of Anoka is currently working on a development proposal with Riverplace Counseling Center who <br />wishes to relocate their facility from Ferry Street in Anoka to these two parcels directly adjacent to the City of <br />Ramsey. Attached are concept drawings and construction plans for the proposed Riverplace Counseling Center. The <br />developer has stated they anticipate installing a 6' tall privacy fence along the Anoka/Ramsey border, if funding is <br />available. The tentative project schedule is to begin site grading in April and start construction of the building in <br />May. The developer's goal is to get a Certificate of Occupancy by the end of 2016. <br />The two City of Anoka owned parcels are currently zoned R-6, Manufactured Home, and are guided for High <br />Density Residential in the City of Anoka's Comprehensive Plan. According to Anoka Staff, the proposed use is <br />consistent with their Comprehensive Plan, however, a Zoning Amendment will be needed to allow the proposed <br />Riverplace Counseling Center development to occur on the site since the R-6 district generally only permits parks, <br />churches and manufactured home parks. The City of Anoka is electing to approve a Planned Unit Development, <br />which Anoka states is an acceptable Zoning Amendment for the proposed use under their Zoning Code. A Public <br />Hearing was held by the Anoka Planning Commission on April 5, with final approval anticipated in early May. <br />UPDATED 4/22/16: Ramsey Staff held an informational Open House for Rivlyn Avenue residents on Thursday, <br />April 21st During the Open House, City of Anoka staff presented information on the proposed development and <br />responded to questions. More information on the Open House, including the feedback received, is discussed in <br />detail in the preceding case. <br />Alternatives: <br />Alternative #1 — Motion to adopt Resolution #16-04-062 approving a Joint Powers Agreement with the City of <br />Anoka for sanitary sewer service. <br />UPDATED 4/22/16: Staff supports this alternative because it allows the City of Anoka to serve their two parcels <br />with sanitary sewer as cost-effectively as possible which will help fund enhanced buffer improvements between the <br />proposed development and properties in the City of Ramsey. <br />Alternative #2 — Motion to deny adoption of Resolution #16-04-062 at this time. <br />UPDATED 4/22/16: Staff does not support this alternative because it does not allow the City of Anoka to serve <br />their two parcels with sanitary sewer as cost-effectively as possible which could result in little to no buffer <br />enhancements between the proposed development and properties in the City of Ramsey. <br />Funding Source: <br />Approving the attached JPA will not result in costs to the City of Ramsey. <br />Approving the JPA will allow the City of Anoka to most cost-effectively serve their two parcels with sanitary sewer <br />service using the City of Ramsey's trunk sewer, which will also allow their two parcels to be developed. The JPA <br />requires the City of Anoka to pay all costs required to construct, maintain and operate the sanitary sewer services <br />that will serve their two parcels, including allowing the City of Ramsey to collect standard sewer fees from the City <br />of Anoka. The City of Anoka will also be responsible for paying all costs required to record the amended JPA. <br />Recommendation: <br />
The URL can be used to link to this page
Your browser does not support the video tag.