Laserfiche WebLink
$UN-02-2004 16:~4 TI<D~ 65~ 2~2 008~ P.04/14 <br /> <br />Mr. Brian Olson <br />City of Ramsey <br />Proposal for Engineering Services - Anoka County Road 56 (Ramsey Boulevard) Reconstruction <br />June 2, 2004 <br />Page 3 <br /> <br />C. PRELIMINARY GEOMETRIC LAYOUT <br /> <br />R('dew turn lanes i.nchtded in the OWNER'S preliminary geometric layout. <br />Revise the prelimirmry geometric layout. <br /> <br />De:sign east and we-;t legs ofCR 116. <br /> <br />Desiga profiles for east and west legs of CR 116. <br /> <br />Dctermine/incorpo~ ate the preliminary construction limits. <br /> <br />Prepare Opinion of Probable Construction Cost for the preliminary geometric <br />layout. <br /> <br />Submit geometric layover for the OWNER'S review and approval. <br /> <br />Revise geometric byout per the OWNER'S comments. <br /> <br />TRAkTIC <br /> <br />CONTROL SIGNAL SYSTEM <br /> <br />2. <br /> <br />3. <br /> <br />4. <br /> <br />5. <br /> <br />6. <br /> <br />7, <br /> <br />Coordinate rccciving traffic counts from Anoka County. <br /> <br />Prepare two Signal lusiification Reports. <br /> <br />Prepare and submit two preliminary Traffic Signal Plans. <br /> <br />P~cpare and submit two final Traffic Signal Plans_ <br /> <br />Revise and resubmi~ two final Traffic Signal Plans. <br /> <br />Prepare Opinion of Problem Construction Cost for the two Traffic Signal Plans. <br /> <br />Complete and submit two sets of Division SS Special Provisions. <br /> <br />DETAIL DESIGN PLAN;; AND SPECIFICATIONS <br /> <br />30% Plan Submittal <br /> <br />a. Prepare Storm Sew~:r design. <br />b. Develop Alignmeni Plan/Tabulation. <br />c, Develop Typica3 Sections and Insets, <br />d. Develop General Layout Plan, <br />e. Develop Roadway Construction Plans. <br />f. Develop lnplace~Removals Plan. <br /> <br /> Develop Roadw;~y Profiles. <br /> <br />h. Develop Tabulation Sheets. <br /> <br /> Develop Cross Sections. <br /> <br />i. Develop Title Sl-~eet. <br /> <br /> <br />