My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/08/2004
Ramsey
>
Public
>
Agendas
>
Council
>
2004
>
Agenda - Council - 06/08/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 2:27:06 PM
Creation date
6/4/2004 2:54:38 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/08/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
$UN-02-2004 16:~4 TI<D~ 65~ 2~2 008~ P.04/14 <br /> <br />Mr. Brian Olson <br />City of Ramsey <br />Proposal for Engineering Services - Anoka County Road 56 (Ramsey Boulevard) Reconstruction <br />June 2, 2004 <br />Page 3 <br /> <br />C. PRELIMINARY GEOMETRIC LAYOUT <br /> <br />R('dew turn lanes i.nchtded in the OWNER'S preliminary geometric layout. <br />Revise the prelimirmry geometric layout. <br /> <br />De:sign east and we-;t legs ofCR 116. <br /> <br />Desiga profiles for east and west legs of CR 116. <br /> <br />Dctermine/incorpo~ ate the preliminary construction limits. <br /> <br />Prepare Opinion of Probable Construction Cost for the preliminary geometric <br />layout. <br /> <br />Submit geometric layover for the OWNER'S review and approval. <br /> <br />Revise geometric byout per the OWNER'S comments. <br /> <br />TRAkTIC <br /> <br />CONTROL SIGNAL SYSTEM <br /> <br />2. <br /> <br />3. <br /> <br />4. <br /> <br />5. <br /> <br />6. <br /> <br />7, <br /> <br />Coordinate rccciving traffic counts from Anoka County. <br /> <br />Prepare two Signal lusiification Reports. <br /> <br />Prepare and submit two preliminary Traffic Signal Plans. <br /> <br />P~cpare and submit two final Traffic Signal Plans_ <br /> <br />Revise and resubmi~ two final Traffic Signal Plans. <br /> <br />Prepare Opinion of Problem Construction Cost for the two Traffic Signal Plans. <br /> <br />Complete and submit two sets of Division SS Special Provisions. <br /> <br />DETAIL DESIGN PLAN;; AND SPECIFICATIONS <br /> <br />30% Plan Submittal <br /> <br />a. Prepare Storm Sew~:r design. <br />b. Develop Alignmeni Plan/Tabulation. <br />c, Develop Typica3 Sections and Insets, <br />d. Develop General Layout Plan, <br />e. Develop Roadway Construction Plans. <br />f. Develop lnplace~Removals Plan. <br /> <br /> Develop Roadw;~y Profiles. <br /> <br />h. Develop Tabulation Sheets. <br /> <br /> Develop Cross Sections. <br /> <br />i. Develop Title Sl-~eet. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.