My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 06/08/2004
Ramsey
>
Public
>
Agendas
>
Council
>
2004
>
Agenda - Council - 06/08/2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/24/2025 2:27:06 PM
Creation date
6/4/2004 2:54:38 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
06/08/2004
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
318
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3UN-05-2004 10:50 <br /> <br />Mr. Brian Olson <br />City of Rmnsey <br />Proposal tbr Engineering Services, CSAH 57 (Sunfish L~e Boulevard) Reconstruction <br />June 3, 2004 <br />Page 3 <br /> <br />D. TRAFFIC <br /> <br />2. <br /> <br />3. <br /> <br />4. <br /> <br />5. <br /> <br />6. <br /> <br />7. <br /> <br />CONTROL SIGNAL SYSTEM <br /> <br />Coordinate recei,,ring traffic counts from Anoka County. <br /> <br />Prepare Signal J~sfification Report, <br /> <br />Prepare and subr,fit preliminary Traffic Signal Plan. <br /> <br />Prepare, and tt~re~- final Tr~fic Signal Plan. <br /> <br />Revise and resubmit final Traffic Signal Plan. <br /> <br />~repare Opinion of Problem Construction Cost for the Traffic Signal Plan. <br /> <br />Complete and submi! Division SS Special Provisions. <br /> <br />RIGlt% OF-WAY <br /> <br />t. Identify locations of proposed right-of-way and preliminary temporary easements. <br /> <br />2. I~entffy required t'.tilily easements. <br /> <br />ENVIRONMENTAL DOCUMENTATION <br /> <br /> 1. P~'epare/submit Pr(:lect Memorandum. <br /> <br /> Prepare Watershed NPDES, and COE 404 permits. <br /> <br />DETAIL DESIGN PLANS AND SPECIFICATIONS <br /> <br />1.. .3~0% Plan S ubmitta: <br /> <br />a. Prepare Storm Sewer design. <br />b. Prepare Stormw:~.ter Pond design for two ponds. <br />c. Develop Alignment Plan/Tabulation. <br />d. 17)evelop Typical Sections and Insets. <br />,.:.Develop General Layout Plan. <br />[_ Develop Roadwa~ Construction Plans, <br />g.. i)evelop lnplacc/Rcmovals Plan. <br />h. Develop Tabulation Sheets. <br />i. Develop Cross Se,:;hons. <br />j, Develop Title Sheet. <br />k I}cvelop 8tatemeut of Estimated Quantities (SEQ) Sheets. <br />1. Quality Control Review of Plan documents. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.