Laserfiche WebLink
DETERI~AH WE.L.DING & TANK SERVICE, INC. <br /> <br />124'1 72nd Ave~ NoE, ~AinneepoJis, Minnesota 55432 (612) 571-8110 <br /> <br />January <br /> <br />Ref. #4420 <br /> <br />City of Rallmey <br />15153 Nowth~,n :ilvd NW <br />Ramsey, MN 553{13 <br /> <br />Attentiont ~4er]e Ao MevJ. sse; <br /> <br />RE: Pump a~]r] piping on Ford ctnassis w/stainless tank <br /> <br />This is our esi:imate to do .he following: <br /> <br />1. Install Gorman Rupp 02Fl pdmp o~] customer's chassis. <br />2. Install PTO with drjveli ~e to pump on streetside. PTO to be cable shift. <br />3. Mount 2.- fltlsher nozzles one each side on rear of chassis. <br />4. Mount ]- flt~sher no?,zle ;treetside front of cab. <br />5. Iso]atio~ v.,lves mounted 1 for front and 1 for rear. <br /> Valves to have adjustabl,~ hand]es mounted in cab with cables to spring <br /> load iso)ation valves. <br />6~ Install ]0"x].0" ,%quare d]mp valve in rear of tank. <br />'7~ Instal] hydrant filli lin~ curbside rear of tank. <br />8. Provide valve for possib~~ extra pump-off line to front. <br />9. Provide bypass line to i ~sure safety feature in pump discharge line. <br /> <br />Labor, approximately: <br /> <br />,:2000. O0 <br /> <br />Material, app}. oximate ] I/: ~3258~00 <br /> <br />Thank yot] f{~r ?bis oppo~;tun:tly to be of service to you. <br />Sincerely, <br /> <br />David L. Anderson <br />Serv±c~ <br /> <br />DLA/kss <br /> <br /> Voiumetric F overs e Aviation Fuelers & Hydrant Carts <br /> <br /> Rep;tiring ,% R¢?rmdltioning Truck T2r~ks & Tran",Dnrls <br />Insfallin¢ & Nerncd~ fin§ Bulk Plan[s, Terminals & Airport Fuel Rysterns <br /> <br /> <br />