Laserfiche WebLink
CIT/' 01~ ~dCSg~ <br /> <br />~,~OI~ITIONAL US~ P%RI4IT <br />~t~ING AND ~CAYATI~6 <br />L~ & G. ~IB%IN INC. <br /> <br />On March __. 1927 a conditior~lI use permit vas issued to L. & C. Rehbein for <br />the grading and excavation of fill in the Northfork P.U.Do The property to be <br />graded and excavated is located south of 161st Avenue ~.I/. and west of Andrie <br />Street N,W, The intent of tt~e grading and excavating is to create a man-made <br />lake with approximately 40 a~.:res of surface area and an average depth of 25 <br />feet. This grading and excavating permit sba11 apply to that property legally <br />described as follows: <br /> <br />That part of 0utlCt i: of Northfork located in the South Half of <br />Secf:ion 18 and the ~-o~t.h Half of Section 19, ~ownship 32, Range <br />Anoka ~ounty, ~i. nne~o~a, except that area located on the east side of <br />Andrie Street. <br /> <br />This permit is issued pursua;~t to Section 170.013D of the Ramsey City Code. <br />This conditional use permi~ is perpetual in its duration so long as the <br />conditions imposed herein ar~:~ complied with, The conditions of this permit are <br />as follows: <br /> <br />A phasing plan and ~estoration plan shall be provided and followed to <br />minimize wind and w~ter_ erosion of the site and which plan shall not <br />alloy for more than five acres of shoreland to be exposed at any one <br />time. The five acr~-s o£ exposed area shall be exclusive of the beach <br />area and water surface° Said plans are attached hereto and <br />incorporated herein as Exhibit A. Restoration as used herein shall be <br />defined as meaning grading and top soil replacement and grass seeding <br />such ~.hat turf is est:ablished which viii prevent water and wind <br />eroaiou. <br /> <br />No hm~ling shall be alloyed on any residential stgeets including <br />Jack, is Street and A:~drie Street. Only State, County and Hunicipal <br />State lid Streets constructed to 9 ton standards shall be used as haul <br />roads, <br /> <br />3. All final slopes sh~:l! be less than four feet horizontal to one foot <br /> vertical (4:1), <br /> <br />The hours of the grading and excavating operation shall be limited to <br />the following: <br /> ~onday through Saturday: 6:00 a.m. to 10:00 p.m. <br /> <br />No more than 5 acre~- oil shoreland area shall be graded and excavated <br />at any one tine and the remainder of the site excluding the lake and <br />beach shall be comp] e~ed restored before commencing any new operations <br />on ~he site. Rehbein shall notify City staff for inspection of the <br />site prior to comme~cing operations in a new area on the site. <br /> <br /> <br />