My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 05/26/1987
Ramsey
>
Public
>
Agendas
>
Council
>
1987
>
Agenda - Council - 05/26/1987
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 1:41:42 PM
Creation date
6/8/2004 2:17:40 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
05/26/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SCHEDULE "B" <br /> <br />Item <br /> <br />- STORM SEWER CONSTRUCTION - ROANOKE STREET <br /> <br /> Used Estimated <br /> to Date Quantity <br /> <br />Unit Pr ice <br /> <br />Extension <br /> <br /> 1. 2101.501 Clearing 0 AC 0.50 AC <br />2. 2101.506 Grubbing 0 AC 0.50 AC <br />3. 2503.511 15" NCP Class III 94 LF 79 LF <br />4. 2503.511 21" NSP Class III 52 LF 76 LF <br />5. 2503.511 30" RCP Class III 160 LF 55 LF <br />6. 2503.511 30" ~CP Class III 94 LF 64 LF <br />7. 2503.511 30" RCP Class III 187 LF 52 LF <br />8. 2503.511 30" RCP Class III 225 LF 74 LF <br />9. 2503.511 30" RCP Class III 0 LF 141 LF <br />10. 2503.511 30" REP Class III 0 LF 280 LF <br />11. Spec. 21" RCP Flared t~nd Section <br /> (w/trash guard) 1 EA 1 EA <br />12. Spec. 30" NCP Flared ~d Section <br /> (w/trash guard) 1 EA 1 EA <br />13. 2506.508 Standard Manhole (48") 1 EA 4 EA <br />14. 2506.508 Special Manhole (72") 4 EA 1 EA <br />15. 2506.508 Extra Depth of Manhole 6 LF 12 LF <br />16. 2506.509 Standard Catchbasin (48") 3 EA 3 FA <br />17. 2511.501 Random Riprap Class III 0 CY 5 CY <br />18. 2511.507 Grouted Riprap Class III 0 CY 10 CY <br />19. 2105.511 Common Channel Excavation 0 CY 300 CY <br />20. 2575.505 Sodding 0 SY 200 SY <br />21. 2575.501 Seeding 0 AC 1.1 AC <br />22. 2575.511 Mulch Material Type I 0 T 2.2 T <br />23. 2575.531 Commercial Fertilizer <br /> (20-10-10) 0 T 0.3 T <br />24. 2502.541 Perf. 4" Subdrain Pipe 0 LF 400 LF <br />25. Spec. Connection of Subdrain <br /> to Manhole 0 EA 3 FA <br />26. Spec. Sedimentation Basin <br /> Outlet Structure 1 IS 1 IS <br /> <br />TOTAL SCHEDULE "B": <br /> <br />$2,000.00 /AC <br />$2,000.00 /AC <br />$20.00 /LF <br />$23.00 /LF <br />$35.00 /LF <br />$35.00 /LF <br />$35.00 /LF <br />$35.00 /LF <br />$35.00 /LF <br />$35.00 /LF <br /> <br /> $668.00 /FA <br /> <br />$848.00 /EA <br />$790.00 /FA <br />$1,500.00 /FA <br />$45.00 /LF <br /> $750.00 /FA <br /> $65.00 /CY <br /> $85.00 /CY <br /> $2.00 /CY <br /> $3.00 /sY <br />$1,250.00 /AC <br /> $2o0.00 /T <br /> <br /> $4O0.00 /T <br /> $6.90 /LF <br /> <br /> $1o0.00 /FA <br /> <br />$1,000.00 /AS <br /> <br />$0.00 <br />$0. O0 <br />$1,880.00 <br />$1,196.00 <br />$5,600.00 <br />$3,290.00 <br />$6,545.00 <br />$7,875.00 <br />$0.00 <br />$o.o0 <br /> <br /> $668.00 <br /> <br />$848.O0 <br />$790.00 <br />$6,000.O0 <br />$270.00 <br />$2,250.00 <br />$o.oo <br />$o. o0 <br />$0.0o <br />$o. 00 <br />$0.0o <br />$0.o0 <br /> <br /> $o.00 <br /> $0.00 <br /> <br /> $0.o0 <br />$1,0o0.00 <br /> <br />$38,212.00 <br /> <br />SUMMARY OF BIDDING: <br /> <br />Total Bid Schedule "A": <br />Total Bid Schedule "B": <br /> <br />Work Completed to Date: <br /> Less 5% Retainage: <br /> Less Pay Estimate No. 1: <br /> <br />WE RECCt4MEND PARTIAL PAYMENT OF: <br /> <br />Please verify the amount of previous payments, <br /> <br />if any, <br /> <br />$51,794.50 <br />$38,212.00 <br /> <br />$90,006.50 <br /> $4,500.33 <br />$35,346.65 <br /> <br />$50,159.53 <br /> <br />prior to making payment. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.