Laserfiche WebLink
SCHEDULE "B" - ~TERMAIN/FLINTWOOD HILLS 3RD ADDITION (Improv. Proj. 86-17) <br /> <br /> Used Estimated <br />Item To Date Quantity Unit Price <br /> <br />Extension <br /> <br />1.6" Pipe <br />2.8" Pipe <br />3. Hydrants <br />4.6" Valves <br />5.8" Valves <br />6.8"x6"xS" Tee <br />7.10"x6"x10" Tee <br />8.8"x8"x8" Tee <br />9.6"x6"x6" Tee <br />10.10"xS" Reducer <br />11.8" Bends <br />12.6" Bends <br />13.6" Plug <br />14.1" Service Connection <br />15.1" Service Pipe <br />16.8"x10" Increaser * <br />17.10" Pipe * <br />18.10x6x10 Tees * <br />19.10x8x10 Tee * <br />20.10" Valves * <br />21.10" Plug * <br />22. Lowering of Watermain** <br /> <br />908 LF 1,000 LF $12.00 /LF <br />1,157 LF 1,249 LF* $14.00 /LF <br />7 EA 7 EA $1,000.00 /EA <br />13 EA 13 EA $280.00 /EA <br />3 EA 3 FA* $380.00 /FA <br />4 EA 4 EA* $110.00 /EA <br />1 EA 1 EA $1,600.00 /EA <br />0 EA 0 EA* $120.00 /EA <br />1 EA 1 EA $100.00 /EA <br />1 EA 1 EA $80.00 /EA <br />2 EA 4 EA $80.00 /FA <br />1 FA 1 EA $75.00 /FA <br />4 FA 4 FA $20.00 /FA <br />54 EA 54 FA $55.00 /FA <br />1,796 LF 1,530 LF $11.00 /LF <br />1 FA 1 EA $80.00 /FA <br />696 FT 696 FT $17.00 /LF <br />8 FA 8 FA $175.00 /FA <br />1 FA 1 FA $176.00 /EA <br />2 FA 2 FA $525.00 /FA <br />1 FA 1 EA $60.00 /FA <br />1 LS 1 LS $1,980.00 /LS <br /> <br />SCHEDULE "C" - STORM SEWER/FLINTWGOD HILLS 3RD ADDITION (Imp. Proj. 86-17) <br /> <br /> Used Estimated <br />Item Depth To Date Quantity Unit Price <br /> <br />$10,896.00 <br />$16,198.00 <br />$7,000.00 <br />$3,640.00 <br />$1,140.00 <br />$440.00 <br />$1,600.00 <br />$0.00 <br />$1oo.00 <br />$80.o0 <br />$160.00 <br />$75.00 <br />$80.00 <br />$2,970.00 <br />$19,756.00 <br />$80. O0 <br />$11,832.00 <br />$1,400.00 <br />$176.00 <br />$1,050.00 <br />$60.00 <br />$1,980.00 <br /> <br />$80,713.00 <br /> <br />Extension <br /> <br /> 1.2503.511 15" NSP Class II Varies <br /> 2.2503.511 18" NSP Class II Varies <br /> 3.2503.511 24" RCP Class II Varies <br /> 4.2506.508 Manholes <br /> 5.2506.509 Catch Basin <br />6.Spec. 15" Flared End Section <br />7.Spec. 24" Flared End Section <br />8.2511.501 Class III Random Riprap <br />9.2511.507 Class III Grouted Riprap <br />10.2575.501 Seeding <br />11.2575.511 Mulch Material Type I <br />12.2575.531 Com. Fertilizer 20-10-10 <br />13.Spec. Topsoil <br />14.Perforated Pipe <br />15.Connection of Perforated Pipe <br /> to Manhole <br /> <br />TOTAL SCHEDULE "C": <br /> <br />* As Per Change Order No. 2 <br />** Field Change <br />*** Deleted as Per Change Order <br /> <br />169 LF 150 LF $24.00 /LF <br />42 LF 38 LF $26.00 /LF <br />135 LF 135 LF $30.00 /LF <br />2 EA 2 EA $900.00 /EA <br />3 FA 3 EA $1,000.00 /EA <br />2 EA 2 EA $500.00 /FA <br />1 EA 2 EA $650.00 /FA <br />15 CY 15 CY $35.00 /CY <br />3 CY 3 CY $40.00 /CY <br />0 AC 0.05 AC $200.00 /AC <br />0 T 0.1 T $250.00 /T <br />0 T 0.02 T $300.00 /T <br />0 CY 27 CY $7.00 /CY <br />0 LF 0 LF*** $5.00 /LF <br /> <br />0 FA 0 EA*** $250.00 /EA <br /> <br />$4,056.00 <br />$1,092.00 <br />$4,050.00 <br />$1,800.00 <br />$3,000.00 <br />$1,000.00 <br />$65O.0O <br />$525.0O <br />$120.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br /> <br />$0.00 <br /> <br />$16,293.00 <br /> <br /> <br />