Laserfiche WebLink
June 18, 1987 PAY ESTIMATE NO. 4 (FINAL) Page 1 <br /> <br />}bnorable Mayor & City Council <br />City of Ramsey <br />15153 Nowth~n Boulevard N.W. <br />Ramsey, Minnesota 55303 <br /> <br />Re: Street Construction Imp. Proj. 86-15 <br /> Contractor: H&S Asphalt Company <br /> Bid Amount: $238,386.45* <br /> Award Date: Aug. 26, 1986 <br /> Completion Date: June 1, 1987'* <br /> <br />Dear Council Members: <br /> <br />The following work has been completed on the above referenced project by <br />H&S Asphalt Company. <br /> <br />SCHEDULE "A" - 153RD AVE. N.W. (S.A.P. 199-112-01) <br /> <br /> Used Estimated <br />Item To Date Quantity Unit Price <br /> <br />Extension <br /> <br /> 1. 2101.502 Clearing <br /> 2. 2101.507 Grubbing <br /> 3. 2105.501 Common Excavation <br /> 4. 2105.505 Muck Excavation <br /> 5. 2104.505 Bitum. Removal <br /> 6. 2105.523 Common Borrow <br /> 7. 2211.501 Class 5 Aggregate 3493.65 T <br /> 8. 2331.504 Bitum. Material 98.97 T <br /> for Mixture <br /> 9. 2331.508 Bituminous 1799.36 T <br /> Surface (2331) <br />10. 2341.504 Bitum. Material 79.8 T <br /> for Mixture <br />11. 2341.508 Bituminous 1,451 T <br /> Surface (2341) <br />12. 2357.502 Bituminous <br /> Tack Coat <br />13. 2503.511 18" RSP Class III <br />14. 2503.511 21" RSP Class III <br />15. Spec. 18" RCP Flared End <br /> Sections <br />16. Spec. 21" RSP Flared <br /> End Sections <br />17. 2511.501 Class III <br /> Random Riprap <br />18. 2506.509 Std. Catchbasin <br /> (46" x 34") <br />19. 2531.502 Concrete Curb <br /> & Gutter <br /> <br /> 62 TR 30 TR <br /> 62 TR 30 TR <br />19,269 CY 20,500 CY <br /> 2,600 CY 800 CY <br /> 400 SY 160 SY <br /> 6,796 CY 3,500 CY <br /> 4,000 T <br /> 100 T <br /> <br /> 1,775 T <br /> 90 T <br /> 1,275 T <br /> 800 GAL 925 GAL <br /> <br /> 99 LF 100 LF <br /> 236 LF 62 LF <br /> 3 EA 3 EA <br /> <br /> 1 EA 1 EA <br /> 13 CY 18 CY <br /> 5 FA 6 FA <br /> <br /> 9,903 LF 10,000 LF <br /> <br /> *As per Change Order No. 1 <br />**Extended due to unfavorable weather in 1986 <br /> <br />$42.00 /TR $2,604.00 <br />$42.00 /TR $2,604.00 <br />$1.70 /CY $32,757.30 <br />$3.75 /CY $9,750.00 <br />$2.00 /SY $800.00 <br />$1.95 /CY $13,252.20 <br />$4.95 /T $17,293.57 <br />$125.00 /T $12,371.25 <br /> <br />$10.65 /T $19,163.18 <br /> <br />$125.00 /T $9,975.00 <br /> <br />$12.00 /T $17,412.00 <br /> <br /> $0.70 /GA $560.00 <br /> <br /> $35.00 /LF $3,465.00 <br /> $38.00 /LF $8,968.00 <br />$850.00 /EA $2,550.00 <br /> <br />$900.00 /F3% $900.00 <br /> <br /> $80.00 /CY $1,040.00 <br />$950.00 /EA $4,750.00 <br /> <br />$4.25 /LF $42,087.75 <br /> <br /> <br />