Laserfiche WebLink
SCHEDULE "B" <br /> <br />Item <br /> <br />- STORM SEWER CONSTRUCTION - ROANOKE STREET <br /> <br /> Used Estimated <br /> to Date Quantity <br /> <br />Unit Price <br /> <br />Extension <br /> <br /> 1. 2101.501 Clearing 0.5 AC 0.50 AC <br />2. 2101.506 Grubbing 0.5 AC 0.50 AC <br />3. 2503.511 15" RCP Class III 94 LF 79 LF <br />4. 2503.511 21" RCP Class III 52 LF 76 LF <br />5. 2503.511 30" RCP Class III 160 LF 55 LF <br />6. 2503.511 30" RCP Class III 94 LF 64 LF <br />7. 2503.511 30" RCP Class III 187 LF 52 LF <br />8. 2503.511 30" RCP Class III 225 LF 74 LF <br />9. 2503.511 30" RCP Class III 0 LF 141 LF <br />10. 2503.511 30" RCP Class III 0 LF 280 LF <br />11. Spec. 21" NCP Flared End Section <br /> (w/trash guard) 1 EA 1 EA <br />12. Spec. 30" RCP Flared End Section <br /> (w/trash guard) 1 EA 1 EA <br />13. 2506.508 Standard Manhole (48") 1 EA 4 EA <br />14. 2506.508 Special Manhole (72") 4 EA 1 EA <br />15. 2506.508 Extra Depth of Manhole 6 LF 12 LF <br />16. 2506.509 Standard Catchbasin (48") 3 EA 3 EA <br />17. 2511.501 Random Riprap Class III 10 CY 5 CY <br />18. 2511.507 Grouted Riprap Class III 5 CY 10 CY <br />19. 2105.511 Common Channel Excavation 300 CY 300 CY <br />20. 2575.505 Sodding 80 SY 200 SY <br />21. 2575.501 Seeding 1 AC 1.1 AC <br />22. 2575.511 Mulch Material Type I 2 T 2.2 T <br />'23. 2575.531 Commercial Fertilizer <br /> (20-10-10) 0.25 T 0.3 T <br />24. 2502.541 Perf. 4" Subdrain Pipe 0 LF 400 LF <br />25. Spec. Connection of Subdrain <br /> to Manhole 0 EA 3 EA <br />26. Spec. Sedimentation Basin <br /> Outlet Structure 1 LS 1 LS <br /> <br />TOTAL SCHEDULE "B": <br /> <br />$2,000.00 /AC $1,000.00 <br />$2,000.00 /AC $1,000.00 <br />$20.00 /LF $1,880.00 <br />$23.00 /LF $1,196.00 <br />$35.00 /LF $5,600.00 <br />$35.00 /LF $3,290.00 <br />$35.00 /LF $6,545.00 <br />$35.00 /LF $7,875.00 <br />$35.00 /LF $0~ 00 <br />$35.00 /LF $0.00 <br /> <br /> $668.00 /FA $668.00 <br /> <br />$848.00 /FA $848.00 <br />$790.00 /EA $790.00 <br />$1,500.00 /EA $6,000.00 <br />$45.00 /LF $270.00 <br />$750.00 /FA $2,250.00 <br />$65.00 /CY $650.00 <br />$85.00 /CY $425.00 <br />$2.00 /CY $600.00 <br />$3.00 /SY $240.00 <br />$1,250.00 /AC $1,250.00 <br />$200.00 /T $40O. 00 <br /> <br /> $400.00 /T $100.00 <br /> $6.90 /LF $0.00 <br /> <br />$100.00 /FA $0.00 <br />$1,000.00 /LS $1,000.00 <br /> <br />$43,877.00 <br /> <br />SUMMARY OF BIDDING: <br /> <br />Total Bid Schedule "A": <br />Total Bid Schedule "B": <br /> <br />Work Completed to Date: <br /> Less 5% Retainage: <br /> Less Pay Estimate No. 1: <br /> Less Pay Estimate No. 2: <br /> Less Pay Estimate NO. 3: <br /> <br />WE RECOMMEND PARTIAL PAYMENT OF: <br /> <br />Please verify the amount of previous payments, <br /> <br />if any, prior <br /> <br />$93,635.00 <br />$43,877.00 <br /> <br />$137,512.00 <br />$6,875.60 <br />$35,346.65 <br />$50,159.53 <br />$25,513.43 <br /> <br />$19,616.79 <br /> <br />to making payment. <br /> <br /> <br />